The Aylmer hydro ruins is located near the Deschênes Rapids. They are hard to miss since the path hugs the shore of the Ottawa River in the area next to the rapids. There are several places to stop and check things out, one of these offers a great view of the ruins of an old dam structure that was built in the late 1800s to harness hydroelectric power from the rapids. If the water is high and running fast (typically in spring), it is truly an impressive sight to see the force of the Ottawa River as it runs through these ruins. It is worth noting that there were plans to rebuild this dam across part of the river as recently as ten years ago (plans to do so fell apart in the face of local opposition).
[...]
In 1821, after the amalgamation of the North-West Company and the Hudson’s Bay Company, Hamar Hubble Day, an old fur trader, opened a small trading post on the Deschênes Portage. He went into business with another petty trader, Murdock McGillivray, and together until 1832 they traded furs in the Allumettes Lake Region and as far up as Lake Timiskaming. Having lost money in his dealings, Hamar Day broke off his association with McGillivray and left the Ottawa Region. The McConnell Brothers, who were very active in the timber industry on the Upper Ottawa, took up from where Day had left off and became part-time fur traders on the side. This lasted until approximately 18473.
H. Day operated a sawmill, a forge and a fulling mill at the Deschênes Rapids around 1828. Around 1840, Robert Conroy Senior seems to have followed in Day’s footsteps. Later on, around 1870, his two sons, Robert and William Conroy, had a large new sawmill built. From 1884 to 1888, they carried out improvements to increase the sawmill’s output capacity. During the same period, Narcisse Cormier operated a flour mill there. Wheat, oats and buckwheat, harvested by the region’s farms, were milled locally at Deschênes.
In 1895, the Deschênes Rapids industrial site was radically transformed. The site’s hydraulic powers were harnessed to produce electricity. The main shareholders of the Hull Electric Railway Company where William Conroy of Aylmer and Mr. Seybold of Ottawa. They decided to have a dam and hydro-electric power station built to supply electricity to the Town of Aylmer and to power the electric tramway network that was being planned to connect Aylmer, Hull and Ottawa. In 1899, the Canadian Pacific Railway bought out the Hull Electric Railway Company and ran it until 1926, when it was sold out to Canadian International Paper. In 1946, when the Hull Electric Company closed down, the Gatineau Power Company, a subsidiary of the CIP, was in charge of the site’s management.
Aylmer; Gatineau, Quebec.
Aylmer Hydro Ruins / Ruins Wave
www.capitalgems.ca/aylmer-hydro-ruins.html
The Aylmer hydro ruins is located near the Deschênes Rapids. They are hard to miss since the path hugs the shore of the Ottawa River in the area next to the rapids. There are several places to stop and check things out, one of these offers a great view of the ruins of an old dam structure that was built in the late 1800s to harness hydroelectric power from the rapids. If the water is high and running fast (typically in spring), it is truly an impressive sight to see the force of the Ottawa River as it runs through these ruins. It is worth noting that there were plans to rebuild this dam across part of the river as recently as ten years ago (plans to do so fell apart in the face of local opposition).
[...]
In 1821, after the amalgamation of the North-West Company and the Hudson’s Bay Company, Hamar Hubble Day, an old fur trader, opened a small trading post on the Deschênes Portage. He went into business with another petty trader, Murdock McGillivray, and together until 1832 they traded furs in the Allumettes Lake Region and as far up as Lake Timiskaming. Having lost money in his dealings, Hamar Day broke off his association with McGillivray and left the Ottawa Region. The McConnell Brothers, who were very active in the timber industry on the Upper Ottawa, took up from where Day had left off and became part-time fur traders on the side. This lasted until approximately 18473.
H. Day operated a sawmill, a forge and a fulling mill at the Deschênes Rapids around 1828. Around 1840, Robert Conroy Senior seems to have followed in Day’s footsteps. Later on, around 1870, his two sons, Robert and William Conroy, had a large new sawmill built. From 1884 to 1888, they carried out improvements to increase the sawmill’s output capacity. During the same period, Narcisse Cormier operated a flour mill there. Wheat, oats and buckwheat, harvested by the region’s farms, were milled locally at Deschênes.
In 1895, the Deschênes Rapids industrial site was radically transformed. The site’s hydraulic powers were harnessed to produce electricity. The main shareholders of the Hull Electric Railway Company where William Conroy of Aylmer and Mr. Seybold of Ottawa. They decided to have a dam and hydro-electric power station built to supply electricity to the Town of Aylmer and to power the electric tramway network that was being planned to connect Aylmer, Hull and Ottawa. In 1899, the Canadian Pacific Railway bought out the Hull Electric Railway Company and ran it until 1926, when it was sold out to Canadian International Paper. In 1946, when the Hull Electric Company closed down, the Gatineau Power Company, a subsidiary of the CIP, was in charge of the site’s management.