VLKong
VLKong
Engineering Marvel
This 120m Miho Museum Suspension Bridge is constructed in 1997 with three different structural systems consisting of cantilevered, cable-stayed and post-tensioned design.
According to architect, I.M. Pei, the giant arch took three months to weld.
IR400S with Supergrain 1+15.
482
views
4
faves
0
comments
Uploaded on May 22, 2018
Engineering Marvel
This 120m Miho Museum Suspension Bridge is constructed in 1997 with three different structural systems consisting of cantilevered, cable-stayed and post-tensioned design.
According to architect, I.M. Pei, the giant arch took three months to weld.
IR400S with Supergrain 1+15.
482
views
4
faves
0
comments
Uploaded on May 22, 2018