Back to photostream

Down the switchback

After a track of empty tie cars were moved out of the way, the two perelite loads were brought down to the switchback and backed down into the CertainTeed plant. October 22, 2011.

1,110 views
6 faves
4 comments
Uploaded on October 28, 2011
Taken on October 22, 2011