After unloading two rails west of town the rail train backed into town and the Herzog machine was set off. With the train backed up to Washington St. the boom on the Herzog truck was used to reposition the header at the end of the train. I suspect this was done to allow rail to be dropped in the other direction (eastbound) along the Minneapolis Sub tomorrow. Once this was done and the equipment in the clear, the train was pulled into the siding and parked for the night. July 29, 2020.