Back to photostream

Upper chute surveys, cleaning and drainage systems

Contractors for the Sacramento District prepare for concrete placements at the Folsom Dam auxiliary spillway project April 29, 2015, in Folsom, California. Preparations include survey work, surface cleaning and installation of groundwater drainage systems (underneath black fabric in background). The U.S. Army Corps of Engineers Sacramento District, together with the U.S. Bureau of Reclamation and state and local partners, is building the spillway to reduce flood risk throughout the Sacramento region. (U.S. Army photo by Todd Plain/Released)

610 views
0 faves
0 comments
Uploaded on May 29, 2015
Taken on April 29, 2015