Radiant Heating Installation
The completion of the second 300' roll of PEX tubing installation. The tubes hanging down to the right is where I'm going to build a small wall to mount the manifolds and tie it into the boiler. There will be a total of 7 rolls used so 14 total tube endings to be tied in to the system when I'm done.