Hand>ABF+EAS+SPx2_EastlandsStadium_SwiftStructures2-Orig
The sketch represents the redraw of the first of two options for Edge Protection mounted on an Aluminium Falsework Beam at the edge of a concrete slab Falsework scheme.
This time the sketch includes Locking Pins, Multi Layer Scaffold Tube Guardrailing and Debris Netting as well.
This sketch is visible as pencil drawn onto good quality green graph paper, The original issue of this sketch proposal would of course have been a black (or grey) photocopy.
Hand>ABF+EAS+SPx2_EastlandsStadium_SwiftStructures2-Orig
The sketch represents the redraw of the first of two options for Edge Protection mounted on an Aluminium Falsework Beam at the edge of a concrete slab Falsework scheme.
This time the sketch includes Locking Pins, Multi Layer Scaffold Tube Guardrailing and Debris Netting as well.
This sketch is visible as pencil drawn onto good quality green graph paper, The original issue of this sketch proposal would of course have been a black (or grey) photocopy.