Back to album

CAD>MC+Tube_CumbrianViaduct_LaingNorthWest-Orig

Another typical example of an existing structure that is not high enough to meet the Guardrail height requirement of the time. The solution is to drop a suitable length of Scaffold Tube down through the Clamp Leg until it makes contact with the deck and then put on a Guardrail at the appropriate height.

102 views
0 faves
0 comments
Uploaded on July 1, 2011
Taken on July 1, 2011