Back to photostream

Crossover Manlift Work

Crews prepare the eastern wall of the future Broadway-City Hall Station area at Broadway and Alberta, where tunnel boring machine Elsie will break through this spring. It?s a long way down from the street to the bottom: 21 metres to be exact.

1,385 views
0 faves
0 comments
Uploaded on April 3, 2023
Taken on January 25, 2023