37111 Fort William to North Blyth. Cambois. 21st March 1990
Empty Alcans from Fort William passing Cambois Depot heading for the lower yard. As more and more local pits closed Cambois Depots workload reduced and during September 1994 the depot closed any remaining work and staff were transferred to Tyne Yard. With the recent demise of imported coal traffic the Fort William Alcan workings now handled by GBRf have become the only remaining traffic on the single line section leading to the Alcan loading point at North Blyth
37111 Fort William to North Blyth. Cambois. 21st March 1990
Empty Alcans from Fort William passing Cambois Depot heading for the lower yard. As more and more local pits closed Cambois Depots workload reduced and during September 1994 the depot closed any remaining work and staff were transferred to Tyne Yard. With the recent demise of imported coal traffic the Fort William Alcan workings now handled by GBRf have become the only remaining traffic on the single line section leading to the Alcan loading point at North Blyth