Tim Shaw
image engineer
industrial civil engineering construction.Forth Replacement Crossing
Drillers fixing an extention to the core sheath, the shaft that the cable is attached to is the sampler, this is dropped down the core sheath to the rock bed ,
2,907
views
5
faves
0
comments
Uploaded on April 17, 2010
Taken on April 18, 2010
industrial civil engineering construction.Forth Replacement Crossing
Drillers fixing an extention to the core sheath, the shaft that the cable is attached to is the sampler, this is dropped down the core sheath to the rock bed ,
2,907
views
5
faves
0
comments
Uploaded on April 17, 2010
Taken on April 18, 2010