View allAll Photos Tagged railpath

October 10, 2016:.

16-503496.

Toronto

Bridges

Toronto Street View

Toronto Roads

Georgetown/Kitchener Corridor Expansion

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Construction

Metrolinx Weston Subdivision

GO Transit

GOT Milton Line

GOT Kitchener Line

GOT Barrie Line

Path/Walkway/Cycles Trails

Dufferin St-Queen St Bridge Expansion For Metrolinx 8th Track And Toronto RailPath

VIA train getting into my GO train shot

Solway Metal Sales, 26 Ernest Ave, from the West Toronto RailPath.

Tower Automotive Building (currently abandoned, future home of the Museum of Contemporary Canadian Art)

West Toronto Railpath at Dundas & Sterling

November 9, 2010

 

Very large tags appear, over top of the previous message.

June 02/23

 

Toronto

Georgetown/Kitchener Corridor Expansion

Georgetown/Kitchener Corridor Expansion: Bloor GO/UPX Track 1 Insulation With New Entrance With Sound Barrier And West Toronto Railpath Upgrade

Path/Walkway/Cycles Trails

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Weston Subdivision

GO Transit

GOT Kitchener Line

GOT Stations

Bloor GO/UPX Station

Airport Express System

UPX (Union Pearson Express)

The West Toronto RailPath was developed and funded by the City of Toronto for bicycle and pedestrian use. It is an example of an urban rails-to-trail project, located in the Junction neighbourhood.

 

Phase 1 of the path, which runs from Cariboo Avenue to Dundas Street West and Sterling Road, was completed in 2009. It was designed by Scott Torrance Landscape Architect Inc. in conjunction with Brown and Storey Architects. The project restored historical rail bridges, added new public art pieces by artist John Dickson. New entrance points are located at Dupont and Bloor Streets. Concrete plazas are located along the trail where existing streets intersect it, providing neighbourhood connections and gathering places. Indigenous plants are thrive here, and the sound of crickets provides s a welcome respite in the big city.

West Toronto Railpath in background

Andrew Cash, Jonah Schein and Andrea Horwath, Leader of the Ontario NDP, talk about the importance of clean, electric trains.

April 2, 2011

 

Still not much change, since these tags were placed back in November of 2010.

July 9, 2013. An old doorway on the Planet Storage building (formerly Viceroy Rubber plant) near Dupont and Dundas. I was standing on the West Toronto Railpath in the Junction Triangle neighbourhood when I took the picture. I'm not sure, but I think the doorway would have been used to load and unload cargo to and from boxcars when a side track ran next to the building.

Solway Metal Sales, 26 Ernest Ave, from the West Toronto RailPath.

June 16, 2017:.

17-517078.

Toronto

Bridges

Georgetown/Kitchener Corridor Expansion

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Construction

Metrolinx Weston Subdivision

GO Transit

GOT Milton Line

GOT Kitchener Line

GOT Barrie Line

Path/Walkway/Cycles Trails

Dufferin St-Queen St Bridge Expansion For Metrolinx 8th Track And Toronto RailPath

Location: West Toronto Railpath

Toronto, Ontario

Canada

 

Photo by Dylan Passmore

Taken: April 26, 2010

June 02/23

 

Toronto

Georgetown/Kitchener Corridor Expansion

Georgetown/Kitchener Corridor Expansion: Bloor GO/UPX Track 1 Insulation With New Entrance With Sound Barrier And West Toronto Railpath Upgrade

Path/Walkway/Cycles Trails

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Weston Subdivision

GO Transit

GOT Kitchener Line

GOT Stations

Bloor GO/UPX Station

Airport Express System

UPX (Union Pearson Express)

Under Dundas Street, near Sterling, December 3, 2009

Tower Automotive Building (currently abandoned, future home of the Museum of Contemporary Canadian Art)

July 1, 2014. Sunset viewed from the western end of Wallace Avenue where it meets the West Toronto Railpath.

Wave 2 kick-off, our family fun run and non-competitive racer. All sun and smiles out here.

May 20, 2011

 

No change.

October 10, 2016:.

16-503501.

Toronto

Bridges

Toronto Roads

Georgetown/Kitchener Corridor Expansion

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Construction

Metrolinx Weston Subdivision

GO Transit

GOT Milton Line

GOT Kitchener Line

GOT Barrie Line

Path/Walkway/Cycles Trails

Dufferin St-Queen St Bridge Expansion For Metrolinx 8th Track And Toronto RailPath

June 02/23

 

Toronto

Georgetown/Kitchener Corridor Expansion

Georgetown/Kitchener Corridor Expansion: Bloor GO/UPX Track 1 Insulation With New Entrance With Sound Barrier And West Toronto Railpath Upgrade

Path/Walkway/Cycles Trails

Commuter Rail System

Metrolinx (Greater Golden Horseshoe Regional Transit System)

Metrolinx Weston Subdivision

GO Transit

GOT Kitchener Line

GOT Stations

Bloor GO/UPX Station

Airport Express System

UPX (Union Pearson Express)

April 24, 2011

 

No change.

February 23, 2012

 

Two new tags, on the right-most panel.

View from the end of the Railpath as Safe and Secure Self Storage burns.

April 24, 2015. Looking north from the Dupont Street entrance.

 

We had some loaded up prize table thanks to our generous donors. Every racer is eligible for our prize draw.

Railpath runners beneath the Wallace Avenue footbridge

1 2 ••• 27 28 30 32 33 ••• 72 73