View allAll Photos Tagged railpath
Kids & Cargo Bikes was a Toronto Bike Month event that took place at Perth Square Park and the West Toronto Railpath.
Saturday, June 6 2015.
December 20, 2016. The Crossways residences and the Dundas-Bloor GO station seen from the West Toronto Railpath.
October 3, 2010. One more photo from Rail of Light during Nuit Blanche. This photo of the lights on the Wallace Ave. Footbridge was taken from the West Toronto Railpath, looking through the "W" of the Wallace Ave. sign. You can see that sign in this photo.
You can see all of my Rail of Light / Nuit Blanche photos in the complete gallery here.
Blogged here: vic.gedris.org/node/306
Kids & Cargo Bikes was a Toronto Bike Month event that took place at Perth Square Park and the West Toronto Railpath.
Saturday, June 6 2015.
October 3, 2010.
Here's another one from the Rail of Light exhibit during Nuit Blanche. This is the view from the West Toronto Railpath, underneath the Wallace Ave Footbridge. This gives a good overview of the whole project: Richard Mongiat's light installation on the bridge above the tracks, Jeff Winch's video projection underneath the bridge, and even train-related artwork on the fence by some local kids.
It was actually pretty busy under this bridge with many people coming through to check it out. But the long shutter speed used for this photo just caught some of the "ghosts" walking by.
Blogged here: vic.gedris.org/node/305
Tower Automotive Building (currently abandoned, future home of the Museum of Contemporary Canadian Art)
Tower Automotive Building (currently abandoned, future home of the Museum of Contemporary Canadian Art)
Kids & Cargo Bikes was a Toronto Bike Month event that took place at Perth Square Park and the West Toronto Railpath.
Saturday, June 6 2015.
September 22, 2010. This was the day that the demolition of the Tower Automotive chimney on Sterling Rd. finally began.
I dropped by the site for a final look on my way to work, and saw them move some of the equipment in. I couldn't stick around for very long though, so I didn't get to see very much of the demo. I went by again on my way home from work and the chimney was only half-gone, and still being slowly chipped away by the demolition machines. Small crowds of people were stopped on the Railpath and Perth Ave. to watch as this thing slowly come down.
Some people were disappointed that it wasn't taken down in one big blast of dynamite. That would have been cool to watch, but it's way too close to peoples' homes.
They actually halted the demolition at around 6:30pm, shortly after I took this photo, and then finished the job the following day.
Blogged here: vic.gedris.org/node/301
Saturday May 1, 2010. The Jane's Walk along the West Toronto Railpath.
This photo was taken at the start of the walk, at the Cariboo Ave. entrance to the Railpath.
June 02/23
Toronto
Georgetown/Kitchener Corridor Expansion
Georgetown/Kitchener Corridor Expansion: Bloor GO/UPX Track 1 Insulation With New Entrance With Sound Barrier And West Toronto Railpath Upgrade
Path/Walkway/Cycles Trails
Commuter Rail System
Metrolinx (Greater Golden Horseshoe Regional Transit System)
Metrolinx Weston Subdivision
GO Transit
GOT Kitchener Line
GOT Stations
Bloor GO/UPX Station
Airport Express System
UPX (Union Pearson Express)