View allAll Photos Tagged officespaces
Teachers Federal Credit Union chose to open a branch at 31 West Main Street in the heart of TRITEC’s New Village Development
The space designed by Joseph T. Matthews Architects and constructed by TRITEC Building Company, Inc. The branch is beautifully appointed incorporating, white wainscoting, wall covering and original brick accents from the 1800’s.
When 31 West Main Street was purchased by TRITEC as part of TRITEC's redevelopment in Patchogue the building was indisrepair and in need of major renovations. TRITEC restored the building back to it’s original character replacing the third floor and replicating the original cornice built in 1897. TRITEC has been blending the elements of the original structure into the current design and functionality of the building for our new tenants.
Waiting for a coat of varnish.
We pulled out the white (ugh) wall-to-wall carpeting upstairs, sanded and stained the original pumpkin pine floors (swoon).
In the office we knocked down the wall that was enclosing the chimney, painted the walls a happy shade of pear green (Spring Dust by Benjamin Moore).
No social niceties here. No small talk. Pure business late on a Friday night. Can't imagine how many pissed off people these guys have to deal with. They could charge a little less though.
Lakeview, Schooner Park and Waterside Court are set amongst Crossways Business Park’s mature landscaping and enjoy a Thameside location in Dartford, Kent.
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
Full time, part time or as you need it office space for rent. Full time office for rental packages come furnished equipped and staff. Virtual office programs allow you to rent office space as you need it and only when you need it. Keep your fixed overhead as low as possible for as long as possible. Great for professionals and solo-preneurs. Learn more at www.virtualofficestaff.com or call 973-509-4632
the other day i spotted some kids had put a keyboard in a tree, and other things like a lamp, well since the snow they seem to have smashed it all up........
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
Every now and then when looking through the canyons of the modern day giants. One will find a glimps of yesteryear.
Suite E has the following:
5 Private Offices
Conference Room
Bullpen with Seating/Phones for 8
Private Bathroom
Kitchenette
2x Private entrance
Air Conditioning
T3 (Wi-Fi and Cat 5 jacks)
Nortel phone system (Monthly access fee plus usage
High volume/speed color printer (As used)
Fax Machine
Monitored Alarm System with Private Code
Office Space as low as $32/day!
See www.4-ProductionSpace.com for details.
Aerial photographs of the construction of the New Village Development.
For more information on this project please visit www.newvillagepatchogue.com
For more information about TRITEC please visit www.tritecrealestate.com
Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.
Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House