View allAll Photos Tagged electricalengineering
Detail der Rückseite eines "Directional Gyro Radio Magnetic Indicator" (Hersteller: Aviation Instrument MFG. Corp., Houston, Texas, USA)
---
Detail of the backside of a "Directional Gyro Radio Magnetic Indicator" (manufacturer: Aviation Instrument MFG. Corporation, Houston, Texas, USA)
Bedienteil für die Breitengradsteuerung einer Transall C-160 (Hersteller: Bodenseewerk Gerätetechnik GmbH, Überlingen, Deutschland. Baujahr: 1970)
---
Control panel for the latitude control of a Transall C-160 (Manufacturer: Bodenseewerk Gerätetechnik GmbH, Überlingen, Germany. Year of manufacture: 1970)
Innenleben eines AC-Millovoltmeters MV 21 (Hersteller: VEB Präcitronic, Dresden, DDR)
---
Inner life of an AC millovoltmeter MV 21 (manufacturer: VEB Präcitronic, Dresden, GDR)
Bedienteil für die Breitengradsteuerung einer Transall C-160 (Hersteller: Bodenseewerk Gerätetechnik GmbH, Überlingen, Deutschalnd. Baujahr: 1970)
---
Control panel for the latitude control of a Transall C-160 (Manufacturer: Bodenseewerk Gerätetechnik GmbH, Überlingen, Germany. Year of manufacture: 1970)
Messbereichswahlknopf eines alten Vielfachmessgerätes (Siemens & Halske, Herstellungsjahr unbekannt, vermutlich um 1950-1960)
---
Range selector knob of an old multiple measuring device (Siemens & Halske, year of manufacture unknown, probably around 1950-1960)
Aus dem Innenleben eines HSI (Horizontal Situation Indicator) Anzeigeinstruments (SMITH INDUSTRIES, Cheltenham)
---
From the inner life of an HSI (Horizontal Situation Indicator) display instrument (SMITH INDUSTRIES, Cheltenham)
Messbereichswahlknopf eines alten Vielfachmessgerätes (Siemens & Halske, Herstellungsjahr unbekannt, vermutlich um 1950-1960)
---
Range selector knob of an old multiple measuring device (Siemens & Halske, year of manufacture unknown, probably around 1950-1960)
Mechanik einer Morsetaste «Junker-Taste» (Joseph Junker GmbH, Honef/Rh). Das grosse Rändelrad in der Mitte dient zur Einstellung des Tastenhubs, das kleine links für die Einstellung des Tastendrucks. Die Junker-Taste wurde 1931 patentiert und bis 2014 weitgehend unverändert gebaut.
---
Mechanism of a Morse key "Junker Key" (Joseph Junker GmbH, Honef/Rh). The large knurled wheel in the middle is for adjusting the key stroke, the small one on the left is for adjusting the keystroke. The Junker key was patented in 1931 and manufactured largely unchanged until 2014.
Vom Urgrossvater des Sekretärs hergestelleter Kristalldetektor. Der Kristalldetektor bildete das zentrale Element von frühen Radios, sogenannten Detektorradios oder Detektorempfängern.
---
Crystal detector, hand-made by Secretary's great-grandfather. The crystal detector was the core element of early radios, so-called crystal radio receivers or crystal sets.
Teil der vom Aufzugsmotor angetrieben elektromechanischen Steuerung eines Aufzugs von 1924.
---
Part of an electro mechanical controller, driven by the hoisting machine, of an elevator from 1924.
Mechanik einer Morsetaste «Junker-Taste» (Joseph Junker GmbH, Honef/Rh). Das grosse Rändelrad in der Mitte dient zur Einstellung des Tastenhubs, das kleine links für die Einstellung des Tastendrucks. Die Junker-Taste wurde 1931 patentiert und bis 2014 weitgehend unverändert gebaut.
---
Mechanism of a Morse key "Junker Key" (Joseph Junker GmbH, Honef/Rh). The large knurled wheel in the middle is for adjusting the key stroke, the small one on the left is for adjusting the actuation force. The Junker key was patented in 1931 and was built largely unchanged until 2014.
Fernschreibraum (Dokumentationsstätte ehemaliger Ausweichsitz der Landesregierung NRW)
---
Teletype room (Documentation site of the former alternative seat of the state government of North Rhine-Westphalia)
Teil der vom Aufzugsmotor angetrieben elektromechanischen Steuerung eines Aufzugs von 1924.
---
Part of an electro mechanical controller, driven by the hoisting machine, of an elevator from 1924.
Ein Stockwerkschaltapprat (auch unter anderen Namen wie Kopierapparat bekannt) war früher Teil einer Aufzugsanlage. Er bildete die Position und Bewegung der Aufzugkabine in Relation zu wichtigen Merkmalen des Aufzugsschachts, insbesondere der Haltepunkte an den Stockwerken, elektromechanisch ab. Seine Schaltkontakte waren mit einer relaisbasierten Aufzugssteuerung verbunden. Heute üblich sind Schachtinformationssysteme, welche auf einer Echtzeit-Messung der Kabinenposition im Aufzugsschacht basieren.
---
A floor switch apparatus (also known under different names such as copying apparatus) used to be part of an elevator system. It mapped the position and movement of the elevator car in relation to important features of the hoistway, in particular the landings at the floors in an electro mechanical manner. Its switching contacts were coupled to a relay-based elevator controller. The state-of the art solution is a hoistway information system that is based on real-time measurement of the car position in the hoistway.
Elektronik der Magnetbandeinheit eines Flugdatenschreibers das Kampfflugzeug "Tornado" (Hergestellt 1998 von Leigh Instruments Ltd, Kanada, für Dornier Systems, Friedrichshafen, Deutschland)
---
Electronics of the magnetic tape unit of a flight data recorder for the "Tornado" fighter aircraft (manufactured 1998 by Leigh Instruments Ltd, Canada, for Dornier Systems, Friedrichshafen, Germany)
Auf der Brücke der «Cap San Diego». Die «Cap San Diego» ist ein nach wie vor seetüchtiges Museumsschiff (Baujahr 1961) und hat seinen Liegeplatz an der Überseebrücke des Hamburger Hafens.
---
At the bridge of the "Cap San Diego". The "Cap San Diego" is a still seaworthy museum ship (built in 1961) and is moored at the Overseas Bridge (in German: "Überseebrücke") at the Port of Hamburg.
Spule und Magnetband der Magnetbandeinheit eines Flugdatenschreibers für das Kampfflugzeug "Tornado" (Hergestellt 1998 von Leigh Instruments Ltd, Kanada, für Dornier Systems, Friedrichshafen, Deutschland)
---
Reel and tape of the magnetic tape unit of a flight data recorder for the "Tornado" fighter aircraft (manufactured 1998 by Leigh Instruments Ltd, Canada, for Dornier Systems, Friedrichshafen, Germany)
Morsetaste «Junker-Taste» (Joseph Junker GmbH, Honef/Rh). Die «Junker-Taste» wurde 1931 patentiert und bis 2014 weitgehend unverändert gebaut.
---
Morse key "Junker Key" (Joseph Junker GmbH, Honef/Rh). The “Junker key” was patented in 1931 and manufactured largely unchanged until 2014.
Im Sprecherraum des Radiostudios (Dokumentationsstätte ehemaliger Ausweichsitz der Landesregierung NRW)
---
In the speakers' room of the radio studio (Documentation site of the former alternative seat of the state government of North Rhine-Westphalia)
In früheren Aufzugsanlagen bildete ein Stockwerkschaltapparat (auch unter anderen Bezeichnungen wie Kopierapparat bekannt) die Position und Bewegung des Fahrkorbs (Aufzugkabine) in Relation zu wichtigen Merkmalen des Aufzugsschachts, insbesondere den Haltepunkte an den Stockwerken, elektromechanisch ab. Seine Schaltkontakte waren mit einer relaisbasierten Aufzugssteuerung verbunden. Heute üblich sind Schachtinformationssysteme, welche auf einer Echtzeit-Messung der Kabinenposition im Aufzugsschacht basieren.
---
In earlier elevator systems, a floor switch apparatus (also known by other names such as copying apparatus) mechanically mapped the position and movement of the elevator car in relation to important features of the elevator hoistway, in particular the landings at the floors, by way of electro mechanics. Its switching contacts were connected to a relay-based elevator controller. The state-of the art solution is a hoistway information system that is based on real-time measurement of the car position in the hoistway.
Spule und Magnetband der Magnetbandeinheit eines Flugdatenschreibers des für ein Kampfflugzeug "Tornado" (Hergestellt 1998 von Leigh Instruments Ltd, Kanada, für Dornier Systems, Friedrichshafen, Deutschland)
---
Reel and tape of the magnetic tape unit of a flight data recorder for the "Tornado" fighter aircraft (manufactured 1998 by Leigh Instruments Ltd, Canada, for Dornier Systems, Friedrichshafen, Germany)
(Bemerkung: Die Aufnahme entstand mit einer Leica IIIb auf Agfa APX 100 Professional).
---
(Note: The picture was taken with a Leica IIIb on Agfa APX 100 Professional).
Führerstand eines Kohlebaggers auf dem Gelände des Kraftwerks der ehemaligen Heeresversuchsanstalt Peenemünde (heute Teil des Historisch-Technischen Museums Peenemünde). In der Heeresversuchsanstalt wurde vor allem die erste funktionsfähigen Grossrakete Aggregat 4 (A4, bekannt geworden als «Vergeltungswaffe» V2) entwickelt und getestet.
---
Cab of a coal excavator tank car on the terrain in front of the power plant of the former Peenemünde Army Research Center (now part of the Peenemünde Historical-Technical Museum), which was built from 1936. The first functioning large rocket, Aggregat 4 (A4, which became known as the "retaliatory weapon" (Vergeltungswaffe) V2), was developed and tested at the Army Research Center.
v. l. n. r.:
Fachwerkstation Titz (1917)
begehbare Blechschrankstation Wegberg (1917)
Masttransformator (1959)
Die Elektrothek Osterath ist ein Technikmuseum für Hochspannungstechnik in Meerbusch-Osterath im Rhein-Kreis Neuss (Nordrhein-Westfalen).
Sound engineering...not something that I've done professionally but something I've definitely spent many, many hours doing. While this particular board is not one I've ran myself, they all have very similar characteristics and function. Push the right buttons & twist the appropriate knobs and the result is a pleasing, comfortable sound that can be heard uniformly by everyone in attendance. Done incorrectly, some hear & some don't or, even worse, you get noises that pierce your ears called feedback. Not a job to take lightly in a 'live' setting...
This photo was taken in 2013 during my previous Project 365…please visit my album for this “REMASTERED” Project 365 as I revisit each day of 2013 for additional photos to share!!
Technical Information (or Nerdy Stuff):
Camera - Nikon D5200 (handheld)
Lens – Nikkor 18-300mm Zoom
ISO – 5000
Aperture – f/5.6
Exposure – 1/20 second
Focal Length – 300mm
The original RAW file was processed with Adobe Camera Raw and final adjustments were made with Photoshop CS6.
"For I know the plans I have for you,” declares the LORD, “plans to prosper you and not to harm you, plans to give you hope and a future." ~Jeremiah 29:11
The best way to view my photostream is through Flickriver with the following link: www.flickriver.com/photos/photojourney57/
This aerial photograph, taken in July 2026, shows the enormous Hornsea 3 Onshore Converter Station and the adjoining Iceni Battery Energy Storage System under construction beside the A47 Norwich Southern Bypass, near Swardeston in Norfolk. Developed by Danish renewable energy company Ørsted, the complex forms a vital part of the £8.5 billion Hornsea 3 Offshore Wind Farm project, one of the largest renewable energy developments ever undertaken in Britain.
Hornsea 3 is being constructed in the North Sea, approximately 120 kilometres off the Norfolk coast, and is designed to generate up to 2.9 gigawatts of electricity, enough to meet the annual electricity requirements of more than 3.3 million UK homes. The development will become one of the world's largest offshore wind farms, with electricity transmitted to Norfolk through high-voltage submarine cables.
The electricity will make landfall at Weybourne on the North Norfolk coast before travelling approximately 51 kilometres through underground cables to this converter station, situated between the A47 and B1113, north of Swardeston. The station's principal purpose is to convert the high-voltage direct current (HVDC) transmitted from the offshore wind farm into alternating current (AC), suitable for distribution through Britain's electricity transmission network. The converted electricity will then pass to National Grid's nearby Norwich Main Substation, close to Dunston.
Construction of the onshore converter station began in spring 2023, with Hitachi Energy appointed as the principal contractor responsible for delivering the converter infrastructure. Irish construction company PJ Hegarty was engaged by Hitachi Energy to undertake major civil engineering works, including site preparation, drainage, reinforced concrete foundations and associated construction.
The converter station comprises two major electrical conversion installations, known as Link 1 and Link 2. These are clearly distinguishable in the photograph by their large, pale-roofed industrial buildings, adjoining transformer compounds, electrical switchgear and extensive steel frameworks. The buildings accommodate sophisticated power electronics and associated equipment required to handle the enormous electrical output of the offshore wind farm.
An especially interesting feature of this photograph is the extensive battery storage infrastructure being installed on either side of the converter station. This is the Iceni Battery Energy Storage System (BESS), developed by Ørsted using Tesla Megapack technology. The installation consists of 170 large battery units, arranged in long, parallel rows on opposite sides of the converter station.
Named after the Iceni, the ancient British tribe associated with Norfolk and Queen Boudica, the battery facility has been designed to provide 300 megawatts of power and 600 megawatt-hours of electricity storage capacity. It will be capable of storing surplus electricity when generation exceeds demand and releasing it back into the grid when required, helping to balance electricity supply and demand.
The battery project has involved collaboration between Ørsted, Tesla, Hitachi Energy and British civil engineering contractor Knights Brown. One unusual engineering challenge is that the two battery compounds are separated by the converter station itself, requiring their connection through 18 high-voltage cables, each more than 600 metres long.
In this July 2026 photograph, the rows of white Tesla battery enclosures are already prominently visible, although construction, electrical installation and commissioning activities remain underway. The site's temporary construction accommodation, extensive workforce car park, storage compounds, internal roads and drainage ponds can also be seen. The A47 Norwich Southern Bypass runs along the left of the photograph, illustrating the remarkable scale of this major energy development within the surrounding Norfolk agricultural landscape.
By October 2026, Ørsted had announced completion of the main construction work on the Iceni battery installation, with final electrical installation and commissioning activities continuing. Once operational, the combined converter station and battery storage facility will play an important role in transmitting offshore wind-generated electricity into Britain's National Grid while providing substantial energy storage capacity.
The photograph provides a detailed record of a major stage in the construction of one of Britain's most significant renewable energy infrastructure projects.
East Anglia Bylines Kate Bluesky 22.11.26
Die Elektrothek Osterath ist ein Technikmuseum für Hochspannungstechnik in Meerbusch-Osterath im Rhein-Kreis Neuss (Nordrhein-Westfalen).
As I was in search of inspiration for a new clock design, I lit this single tube, capriciously selecting the number five. It remained lit on my work table for five days, after which and coincidentally, the final design was complete in my mind. It was then time to set to work.
Vintage Russian numeric display powered by 200V source.
You are like a human transmission tower, transmitting a frequency with your thoughts. If you want to change anything in your life, change the frequency by changing your thoughts (Pinterest)
This is my group of laser tag models playing a game around the pendulum in the "Pendulum Court" in the sciences building at BYU. I really like the colors and contrasts in this overhead shot.
For more of my creative projects, visit my short stories website: 500ironicstories.com
In the heart of Georgian Dublin, once frequented by the clip clop of horse drawn carriages, Merrion Square seen some contrast today as the new Wrightbus StreetDeck Electroliner fully electric double decker was showcased to the media as the National Transport Authority announced 120 vehicles to various cities around Ireland, Limerick to get the first batch next year.
The Electroliner has a rapid charge time of just 2.5 hours, travelling up to 200 miles on full charging & zero emissions.
Wrightbus #LY71GJE
This is a group of students showing off the laser tag system build by students in their junior year in BYU's ECE program. This is actually an "LED tag" system since it uses LEDs instead of lasers. These systems can be played in full sunlight and their receivers are extremely sensitive so they can pick up the dimmer LED beams that are not as tightly focused as those from lasers. This shot in our freight elevator is supposed to look dramatic. From left to right we have Tosha Kohler, Maclain Olsen, Erik Hamilton, and Holly Cluff.
For more of my creative projects, visit my short stories website: 500ironicstories.com
All change at Athlone
In the centre of Ireland, the town bus service has become the first in the country to go all electric with its new fleet of fully electric single deckers for the town's bus service in January 2023.
Launched at the end of January 2023, a fleet of new Alexander Dennis/ BYD enviro200EV operated by Bus Eireann, 11 of these EA class operate routes A1 & A2.
During the initial set up, some of the former Wrightbus streetlite WM class were retained while teething problems were ironed out with the new technology.
These single-deck battery-electric buses, EA class are 12m long with two doorways, bespoke design features, wheelchair ramps, usb charging & coloured priority seating, with up to 73 passengers on 27 fixed seats, six tip-up seats within a permanent wheelchair space and dedicated accommodation for a pram, pushchair or buggy.
The Athlone town service operates with two routes ( A1 & A2 ) from Bealnamulla via Athlone bus & rail station, beyond to Creggan every 15 minutes.
Seen above at Athlone railway & bus station, EA 11 operating the A2, followed by WM 17 on the A1 to Creggan.
Well done Bus Eireann.
The new Wrightbus StreetDeck Electroliner fully electric double decker was showcased to the media as the National Transport Authority announced 120 vehicles to various cities around Ireland, Limerick to get the first batch in 2023.
The Electroliner has a rapid charge time of just 2.5 hours, travelling up to 200 miles on full charging & zero emissions.
Wrightbus #LY71GJE
The new Wrightbus StreetDeck Electroliner fully electric double decker was showcased to the media as the National Transport Authority announced 120 vehicles to various cities around Ireland, Limerick to get the first batch next year.
The Electroliner has a rapid charge time of just 2.5 hours, travelling up to 200 miles on full charging & zero emissions.
Wrightbus #LY71GJE
Seen above at Merrion Square.
Summerhill Garage AX 624 operating a route 15A to Greenhills dating back to 2006, at the time using the Volvo B7 diesel engine, now in 2022 coming to the end of their life cycle with Dublin Bus.
Most likely an industrial CEE 63 A connector with three upstream AEG NT-1 fuses (200 A, 500 V), documented at the Völklinger Hütte.
The oversized protection fuses supply the distribution bus, while the connector provides branch access with a lower current rating.
With 3 phase and 380 Vm the rated power is approx. 132 kVA
This is a shot of Matt Stott pretending to work hard in the BYU cleanroom. This in the lab on campus where we do our microfabrication work on wafers. Matt is dressed in a bunnysuit to keep contaminants from falling on the pink colored wafer which he is holding with tweezers. He is operating one of our PECVD machines which put down a thin coating of glass. Keep up the good work, Matt!
For more of my creative projects, visit my short stories website: 500ironicstories.com
Vemork is a hydroelectric power plant outside Rjukan in Tinn, Norway. The plant was built by Norsk Hydro and opened in 1911, its main purpose being to fix nitrogen for the production of fertilizer. At opening, it was the world's largest power plant with a capacity of 108 MW.
Vemork was later the site of the first plant in the world to mass-produce heavy water developing from the hydrogen production then used for the Haber process. During World War II, Vemork was the target of Norwegian heavy water sabotage operations. The heavy water plant was closed in 1971, and in 1988 the power station became the Norwegian Industrial Workers Museum.
A new power plant was opened in 1971 and is located inside the mountain behind the old power plant.
This is a close up view of the Laser Tag (LED Tag) system build by our electrical engineering students at BYU during their junior year. The system consists of a modified Nerf gun containing an LED and a photodetector connected to an FPGA board worn on the back which does all the computation. Holly Cluff is serving as the model here against a clear blue, late summer sky.
For more of my creative projects, visit my short stories website: 500ironicstories.com