View allAll Photos Tagged builder.
The Clock (Sahat) Tower was built at the end of the 17th century, by Venetian builder Andrea Cornaro.
maps.secondlife.com/secondlife/Pine%20Lake/30/54/28
Stuff:
DRD Bynhilda Shoulders
DE Designs Lace Up Corset
LODE headpiece Feathers Mono
DRD Nerd Goggles
DRD Nerk Neck Wraps
Izzie's Dirt Tattoo
JPK Steampunk Goggles
.Shi Vigilante Earring
[The Forge} Junk Spear
* This Great Egret was adding materials to its already large nest. Taken on Avery Island Southern Louisiana in 2014
THANKS FOR YOUR VISIT AND FOR TAKING THE TIME TO WRITE A COMMENT IT’S MUCH APPRECIATED AND SO MUCH MORE INTERESTING THAN JUST GIVING A FAVE
Shelf Fungi (and more) slowly dissolving a rotting tree trunk on the forest floor.
Balance of nature...
Die Zeche Consolidation, meist kurz Zeche Consol genannt, war der wirtschaftliche Motor der Stadt Gelsenkirchen. Bereits in den 1870er Jahren zählte die Zeche Consolidation zu den förderstärksten im Ruhrgebiet. In kurzer Folge wurde ein Schacht nach dem anderen abgeteuft. In 130 Jahren wurden über drei Millionen Tonnen Kohle gefördert.
Schacht 9 wurde 1915 begonnen, die Förderung begann aufgrund des Ersten Weltkriegs jedoch erst nach 1918. 1922 wurde das Fördergerüst als zweigeschossiges Doppelstrebegerüst noch in Fachwerkbauweise erbaut. Da sich zeitgleich die Vollwandbauweise durchsetzte war es das letzte seiner Art und ist heute eines der wenigen noch existierenden. Zeitgleich wurde das südliche Maschinenhaus vom Zechenbaumeister Heinrich von Bonin (1871-1927) erbaut. Die Besonderheit im Maschinenhaus ist die Zwillings-Dampffördermaschine von 1963, die letzte Dampfmaschine, die von der Gutenhoffnungshütte (GHH) in Oberhausen gefertigt wurde. Das nördliche Maschinenhaus wurde 1937 als kubisch gestalteter Ziegelbau von Dr. Ing. Hans Väth (1897–1950) erbaut. 1938 wurde dort eine Zwillings-Dampffördermaschine aus der Gutenhoffnungshütte installiert.
Auf der Zeche Consol wurden nach ihrer Stillegung und Renovierung vier Kulturprojekte gestartet. Eines ist die Kunstinstallation im nördlichen Maschinenhaus von Werner Thiel (1927-2003). Die anderen sind das Consol Theater, das Musikprobenzentrum Consol 4 sowie das südliche Maschinenhaus mit der Bergbausammlung des IBC.
Die Bergbausammlung des IBC besitzt als zentrales Ausstellungsstück die Zwillings-Dampffördermaschine. Sie hat eine Leistung von 4.100 PS und ein Gewicht von 285 Tonnen. Die Fördermaschine hob Nutzlasten von circa 12t mit 18m/s (65km/h) aus dem über 1.000 Meter tiefen Schacht. Jeden ersten Sonntag im Monat wird sie live vorgeführt.
The Conso colliery, usually called consol, was the economic engine of the city of Gelsenkirchen. As early as the 1870s, the Consolidation colliery was one of the strongest in the Ruhr area. In a short sequence, one shaft after another was demolished. Over three million tonnes of coal have been mined in 130 years.
Shaft 9 was started in 1915, but due to the First World War, production did not begin until after 1918. In 1922, the conveyor structure was still built in half-timbered construction as a two-storey double strut. Since the full-wall construction was prevailing at the same time, it was the last of its kind and is today one of the few still existing. At the same time, the southern machine house was built by the colliery builder Heinrich von Bonin (1871-1927). The special feature of the machine house is the twin steam conveyor from 1963, the last steam engine manufactured by the Gutenhoffnungshütte (GHH) in Oberhausen. The northern machine house was built in 1937 as a cubic brick building by Dr. Ing. Hans Väth (1897-1950). In 1938, a twin steam conveyor from the Gutenhoffnungshütte was installed there.
Four cultural projects were launched at the Consol colliery after its closure and renovation. One is the art installation in Werner Thiel's northern machine house (1927-2003). The others are the Consol Theater, the Music Rehearsal Centre Consol 4 and the Southern Machine House with the Mining Collection of the IBC.
The IBC mining collection has the twin steam conveyor as a central exhibit. It has an output of 4,100 hp and a weight of 285 tons. The conveyor lifted payloads of about 12t at 18m/s (65km/h) from the shaft, which is over 1,000 metres deep. Every first Sunday of the month it is performed live.
Hooded crow (Corvus cornix) perched on a branch with a stick – nest building material – in its beak.
Wrona siwa (Corvus cornix) siedąca na gałązce z patykiem – materiałem do budowy gniazda – w dziobie.
Another dormant pub. My local as well. Nice atmosphere, great beer and food plus a spacious garden at the rear. Soon I hope!!
We have finally seen some snow in southern Wisconsin, making it look and feel a little more like winter. Here on the north side of Watertown, Amtrak's eastbound Empire Builder kicks up the powder a little after just crossing over from 2 main to the single track main at Watertown West.
Amtrak 8
AMTK 130,140,133
Watertown, WI.
January 23, 2022
A late-running Amtrak No. 8, the Empire Builder, cruises through Grizzly, Montana, on December 23, 1998. The train is leaving the snow-covered Rocky Mountains of Glacier National Park behind on this extremely cold day. Leading the silvery Superliner is an all-GE consist, led by warbonnet-clad BNSF No. 761, with P40DCs (822, 808, 817) in three different paint schemes trailing.
Great tit (Parus major) perched on a branch with some nest building material in its beak.
Bogatka (Parus major) siedząca na gałązce z jakimś materiałem do budowy gniazda w dziobie.
© WJP Productions 2025
A fantasy synagogue.
Inspired by the novella The ark builder, written by Chaim Potok.
After crossing a snowy Marias Pass, Amtrak’s eastbound Empire Builder curves through Grizzly, Montana, on a cold December 22, 1998.
I've made a little decorative birdhouse that's hanging near the front door of my house that's been popular over the years.
-A few years ago, some chickadees checked it out a lot, but didn't move in.
-The next year it got invaded by yellow-jackets.
-This year it has attracted a pair of Bewick's wrens.
Of course the houses I've built specifically for wrens, in ideal locations/heights/etc. so far have had no visitors.
Another winter snowfall and brings another late Empire Builder on its trip back to Chicago. Siemens ALC-42 Chargers 302 and 310 are about 5 hours late into the Twin Cities and should arrive at St. Paul Union Deport within the half hour.
Full Youtube video at:
The previous day's eastbound Empire Builder rolled through about an hour ahead of this Christmas day scheduled eastbound Builder. Nothing special about this train other than it's Christmas day passengers traveling by rail, as it should be.
Amtrak Number 8
AMTK 165,19,154
Watertown, WI.
December 25, 2021
It's a gorgeous day upon the grassy knoll, as Amtrak's eastbound Empire Builder races along just east of their Columbus station stop, running only twenty minutes behind today.
Amtrak Number 8
AMTK 130,52
Columbus, WI.
June 4, 2021
The Empire Builder at MP 322, cruising along the Mississippi River at track speed on a beautiful day.
This is a rare sight in Australia these days. A building where carriages were built since 1864. This is the ornate upstairs residence, but at the back of the building on Paterson Street the workshops existed where carriages were manufactured for locals in the 19th century. This historic building sits right across the road from the Launceston Fire Station.
But the story of Frederick Paine doesn't end with building carriages for horses. In fact he saw the writing on the wall and is responsible for building the first ever motorised vehicle in Launceston in 1908 at this very site.. www.julianburgess.com.au/single-post/2019/09/24/praise-fo...
We’re looking out the door window on the rear sleeper of Amtrak’s eastbound Empire Builder moving through a siding over a frigid and barren eastern Montana landscape when the westbound Builder slams by heading into the setting sun on March 4, 1989.
SSC - Triangles
This is rather a literal interpretation of the theme. Don't look too closely or you will see the celotape holding it all together! Giving me the title.
Second build in my Iron Builder round against Caleb (Cheesie), with the Minecraft Trident in sand green as a seed part.
The seed part was used 10 times.
Stalagtite/stalagmite design by Thorsten Bonsch.
Builder's plate for an operational 0-4-0 Porter steam locomotive built in 1889.
Shot for Our Daily Challenge :“Plate”
On a cold and clear Thanksgiving Day, Amtrak train No. 8, the Empire Builder, heads east across the Blackfeet Indian Reservation, leaving the jagged mountains of Glacier National Park in its rearview mirror.
Some new LRT vehicles under wraps from Siemens await delivery to Metro Transit while the Empire Builder hugs the edge of the Minnesota Commercial A Yard. Two types passenger train equipment in the same frame - would be otherwise possible on University Avenue but this will do.
The previous day, Amtrak zipped through town missing the 5 car Seattle section of the train. That section (led by AMTK 307) smashed a tree west of Spokane and was towed back to Seattle and added to the next day's train. (307 was left behind)
Led by 3 differently painted Amtrak locomotives, an unusually big 14-car Empire Builder flies through town with temperatures just barely hitting +10.
Of course, in 2022, I would have much rather shot AMTK 301 ("Day 1") leading. But I feel like in several years when the GEs are gone or hard to find I'll feel differently about catching a bloody Genesis 45 leading.
Winds kept the Becker plant steam away from the sun but also chilled the bones stepping outside to get the shot.
AMTK 45
AMTK 301
AMTK 303
Years ago, before double track, there was a tree that blocked the billboard and was a better photo prop. Granted the billboard has changed recently, but I still miss the tree.
A barn swallow deciding where to add to the nest.
note - originally posted as tree swallow - posted the wrong photo.
Hirundo rustica
Barn Swallows once nested in caves throughout North America, but now build their nests almost exclusively on human-made structures. Today the only North American Barn Swallow population that still regularly uses caves as nest sites occurs in the Channel Islands off the California coast.
As the sun dips across the horizon, the Empire Builder #7 crosses the Gassman Bridge nearly 8 hours late. The polar vortex has played havoc to the railroad for another winter…I can’t wait for spring…BNSF 7983, 312, 310, 361
Not my greatest pan shot, but hey. A BNSF "fakebonnet", (who cares at this point, it's not a common livery anymore no matter how you slice it) C44-9W 744, leads Amtrak train 8, the eastbound 'Empire Builder', under the searchlights at A-3, Western Avenue, Chicago. The train was operating a bit over four hours behind schedule due to engine problems in Washington, (the BNSF leader was picked up in Spokane) and severe winter weather in North Dakota.
Three identical Siemens ALC-42s take the Empire Builder away from Saint Paul Union Depot underneath the bluffs along the Mississippi River. For a long while now Amtrak has only allocated a single coach on the Seattle section while the Portland section retains two. One of those things that makes you say, "Hmmmm...."