View allAll Photos Tagged bathrooms,

A normal morning routine

 

CREDITS

 

Oschiri - Centrale del Coghinas

 

Rolleicord Vb

Kodak TMax 100

Self developed - Bellini Hydrofen (Studional) 1+30 - 11' @ 19 °C

Agefix 1+7 - 10' @ 19 °C

Epson V500 (scanned from negative)

I think this room is my favorite redo room. I can actually go in there barefoot now!! lol............

If you told me a week ago that I'd be building a naked old man with Lego, I'd have called you crazy.

 

More uses for the medium azure clip light.

Always reload the essentials. -HMM

Model: Gergana Dimitrova. A pic for the Penelope Palace apart hotel campaign

Computer graphics picture

Stokie, N16 Project, Bathroom

While not without a few small hiccups, the bathroom is complete... as the new tenants walk in the door, the crew is putting the last bit of touch-up paint on the wall. That was close.

 

Unlike our ipod bathroom upstairs, we wanted to keep with the architecture and style of the house... circa 1920.

Bathroom remodelled with new toilet and pedestal sink

Bathroom after renovation and remodel. The sink is from Pegasus and was a pain to install. I suggest a plumber for that one. And the faucet is by American Standard. I love it because it doesn't have the cold/hot label on the handles (but the tub does...I didn't want the fonts to clash!)

luxury bathroom, bathroom design, modern bathroom, detail visit javabali.info

bathroom design idea villeroy boch detail visit javabali.info

Project By:

Bella Leone Design

Created on: Feb 10, 2009

 

Type:

Bathroom remodeling, Cabinets, Countertops, Doors, Flooring, Lighting, Reconstru...

 

Style: Traditional

Budget: $80K-90K

Time Frame: 4-6 weeks

Views: 92

Location: Chatsworth, CA 91311

 

Description:

 

These empty nesters wanted to make a luxury Master Bathroom from the chopped up space they had. I redesigned the space taking some square footage from the Pool Bathroom and gave them everything they wanted creating a unique and luxurious space. Please see the before and after drawings that illustrate the changes that were made.

 

Tips & Advice:

 

In most cases any room can be redesigned to suit your needs. Even if you can't add on, there are ways to make it look and feel larger depending on how the cabinets and tile are set and which colors are used. Even though walls and plumbing were relocated, the project took about 7 weeks to complete because every product that was to be used had been delivered prior to the demolition.

 

All we need is a bathroom door and real window shades and we'll have ONE room done!

 

BEFORE photo here.

We moved the toilet, installed a clawfoot tub (to replace the shower stall), put in all new tile - and rebuilt the window trim and medicine cabinet. (whew!)

 

Camera Canon EOS 7D

Exposure 0.4

Aperture f/9.0

Focal Length 10 mm

ISO Speed 200

Exposure Bias 0 EV

 

No flash, just one shot, with a colour balance tweak

Finished Bathroom.

Some good elements here. Nothing too offensive, except maybe that gross gray tile floor.

plunger in the corner

1 3 4 5 6 7 ••• 79 80