View allAll Photos Tagged Structural
Our work at Emes School addressed safety, space, and health issues. These works have not only provided more space for children to attend at this affordable community school, but have made the school safer for the children.
We intend to continue monitoring the situation at Emes School and ensure that the children attending class in this new improved classroom are thriving. Our commitment to education means that our relationships with the schools we help go beyond a one off construction project.
While education may not immediately appear to be related to the earthquake, ensuring that children are able to attend school is key to creating communities that are able to resist and recover from disasters. And that means that education is at the heart of long-term, sustainable recovery.
Learn more at www.edvolunteers.org/emes-school
Building work in London, House extension in Fulham, basement renovation in Finchley and Various other building works with London elite Trades
Architecture 150
Project with Tina Dinh
A structure that spanned 3 feet and was designed to hold 250 lbs at its center from a height of 18 inches. Testing on a physical model showed a structural failure in the tension hold-downs, as predicted, at a weight of 265 lbs.
#structuralengineeringservices that reduce your design cycle time and ensure cost effectiveness.
Email : info@veetechnologies.com
Visit : www.veetechnologies.com/industries/engineering-services-a...