For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
For Personal Fall Protective Equipment. Anchorages which allow the subjection
of harness and lanyard, protecting workers against falling risk.
Friendly environmental recycled plastic slot for the anchorage introduction. It can
be installed just before concrete discharge using nails on the inside face of the
formwork covering the building perimeter and holes (staircase, elevator). Once
the concrete gets hard and the formwork is removed, the anchorage can be inserted
into the slot.
Installation of plastic slot every 5 m (depending on the construction requirements), between pliars in order to cover
all the falling risk areas and get 0 factor falling risk. A 15 cm separation to the edges must be respected (30 cm
mass concrete).
Elevate Your Efficiency with the ACE AP21A Aerial Access Platform!
#ACE #AceCranesIndia #AceCranes #ACEAP21A #AerialAccessPlatform #ConstructionEquipment #MaterialHandling #HeavyMachinery #ACEEquipment #SafetyAtHeight #AccessPlatform #WorkingAtHeight #ConstructionSolutions #IndustrialEquipment #InfrastructureDevelopment #EngineeringExcellence #AerialWorkPlatform #ACEMachinery
Unlock the power of safety and skill with Scaffold Training by R2SITC. Our expert trainers are here to guide you through the intricacies of scaffold safety and construction.
SOS is offering the Online Aerial Work Platform Certification course for those who are working at heights.
The course helps to reduce the hazards related to articulating boom, straight telescoping boom, and scissor lift aerial platform.
The course is divided into five modules including operator fundamentals, machine fundamentals, pre-operational inspections, safe operation guidelines.
For more course details, visit our site.
WEB Catch™ is transforming construction safety and efficiency with its revolutionary multi-level encapsulation solution. ️
Our innovative technology was installed on a bridge construction project, allowing uninterrupted traffic flow on the busy road below while ensuring construction debris stays safely contained.
To know more, visit: web-international.com/multi-access-system.php