View allAll Photos Tagged Region3

Victory Liner Inc - 7048

Route: Pasay - Dagupan, Pangasinan v.v

*AMC Tourist Star Rear Edition Deluxe

*Coachbuilder by Almazora Motors Corp.

M.A.N PBM R39 18.350 HOCL | D2066LOH12

 

*Taken at NLEX Dau Access Road, Mabalacat, Pampanga

Von Altino nach Falzarego - Sicht Richtung Marmolada

Dieses Gebiet wurde im 1. Weltkrieg heiß umkämpft.

 

www.alpentourer.de/alpenpaesse/region3/valparola/valparol...

ODOT snowplows work to clear the interstate in southwestern Oregon.

Alaska,nordic ski ,kchs,region 3

alaska,cross country running,KCHS,region 3

Alaska. kenai nordic ski, region 3

was able to capture a variety of solar shots today. Here is a variety including closeups of the current active regions, massive prominence activity, whitelight full disc imaging and some Earth/Jupiter overlay for perspective. Clouds did come in before I could complete my detailed mosaic, however got a bunch of shots of the interesting areas so thats fairly satisfying for now! check out the story for wallpapers.

 

.

Bresser 127L/1200 doublet, Quark Chromosphere, Astronomik UV/IR L-3 (as ERF), PlayerOne Apollo-M Max, Skywatcher EQ6.

Each shot stacked 7% best of 1000 frames.

Captured Sun 28th August 2022 11.00am NZT

An Incident Response truck stops to show the depths of the snow.

Oregon DOT holds traffic at the border while CalTrans clears trouble spots between the border and Redding, CA.

alaska,cross country running,KCHS,region 3

Alaska,nordic ski ,kchs,region 3

Crews from Carter and Company tear out the impact panel on the OR 140 Little Butte Creek Bridge, east of White City. This work is in preparation to strengthen the bridge prior to a Cascadia Subduction Zone earthquake.

This project is part of the HB2017 Southern Oregon Seismic Resiliency Project. Its intent is to keep the Rogue Valley connected between Central Oregon and the Willamette Valley after a Cascadia event.

Photos from the Almeda Fire, Sept. 8, 2020

A rockslide on OR 138 West south of Elkton closed the highway. And estimated 7,000 cubic yards of rock and debris slid onto the highway. Nov. 12, 2021.

ODOT staffs a checkpoint on the east side of the Phoenix interchange, Sept. 8, 2020

Alaska,nordic ski ,kchs,region 3

alaska,cross country running,KCHS,region 3

Trucks line up in anticipation of the reopening of I-5 into California, Dec. 16, 2021.

Oregon DOT holds traffic at the border while CalTrans clears trouble spots between the border and Redding, CA.

Oregon DOT holds traffic at the border while CalTrans clears trouble spots between the border and Redding, CA.

Traffic on Foothills Road between Hillcrest and McAndrews Road

Drivers wait their turn while crews work on one of four bridges on OR 140 between White City and Klamath Falls. This work is in preparation to strengthen the bridge to prior to a Cascadia Subduction Zone earthquake.

This project is part of the HB2017 Southern Oregon Seismic Resiliency Project.

A pedestrian walks toward town on Hillcrest Road under Interstate 5 in north Grants Pass.

Six electronic message signs on northbound Interstate 5 will help keep travelers informed of changing conditions and help regulate speeds on the highest summit on the Interstate 5 corridor.

The signs are located between the Oregon-California border and Ashland.

 

Crews from our White City office in Region 3 demonstrate where blind spots are for the driver of the truck.

Aerial drop on the Bear Creek Greenway fire north of Medford/I-5 on the afternoon of September 9, 2020

Photos from the Almeda Fire, Sept. 8, 2020

A jogger passes the rebuilt D&S Harley Davidson outlet that was destroyed in the Almeda Fire. Temporary improvements to the corridor include asphalt strip to allow development to continue before the OR 99 Glenwood to Coleman Project upgrades bike lanes and sidewalks in the corridor. June 2022

alaska,cross country running,KCHS,region 3

kenai nordic ski,region 3, cross country ski racing, Alaska

kenai nordic ski,region 3, cross country ski racing, Alaska

The District 7 Valley Sign Crew in southwestern Oregon replace damaged signs at the Cabin Creek Safety Rest Area on southbound I-5.

Crews install the first of three bridge beams across Holton Creek in Kerby. It will be the foundation of a new pedestrian/bicycle bridge parallel to U.S. 199. May 28, 2022

Photos from the Almeda Fire, Phoenix near Exit 24, Sept. 8, 2020

Crews from Knife River Materials remove trees and shrubs from the right of way before later roadway improvements on the Jackson Co. Foothill Road project . Jan. 31, 2023

1 3 4 5 6 7 ••• 79 80