View allAll Photos Tagged ExcavatorBucket
Tour Museumspark Rüdersdorf/ 23.07.2022 / Brandenburg / Landkreis Märkisch-Oderland
© ks60one photography - Photos are copyrighted under international law. All rights reserved. Pictures can not be downloaded, reproduced, copied, transmitted or used without explicit written permission by the creator
Homepage Museumspark Rüdersdorf:
Excavator bucket
Cuchara de excavadora o
Cucharón de excavadora
Captura: Camí del Camp de la Vila, Camprodon, Ripollès, Girona, Catalunya.
This 1998 Komatsu PC400LC-6LC excavator is for sale by Big Iron, Inc.
You can view detailed pictures of this excavator in this set. Visit Big Iron's website for more information.
Click Equipment Inventory then Excavators!
Démolition de restructuration des locaux de CCI Formation EECS à Laxou.
P R É S E N T A T I O N
Construction : 2025 → 2027
Architecte : François Henrion Malgras Architectes
Permis de construire : PC 54 304 24 00022
▻ Délivré le 12/09/2025
Fonction : Éducation
A R C H I T E C T U R E
Niveaux : R+2
Hauteur : 12,43 m
Surface des bâtiments à démolir : 2 083 m²
Surface de plancher : 3 795 m²
Superficie du terrain : 8 521 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Laxou (54520)
Quartier : Le Champ-le-Bœuf
Adresse : 3, rue du Mouzon
Travaux de démolition des bâtiments et silos de la Coopérative agricole de Lorraine à Mirecourt.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Vosges (88)
Ville : Mirecourt (88500)
Adresse : 241, rue Docteur-Grosjean
Fonction : Industrie
Démolition : 2026
Permis de démolir n° PD 88 304 25 M0001
▻ Délivré le 30/06/2025
Superficie du terrain : 10 905 m²
Remplacement de 7 aiguillages en gare d’Onville du 03 mars au 26 avril 2026.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Onville (54890)
Travaux de démolition des bâtiments et silos de la Coopérative agricole de Lorraine à Mirecourt.
P R É S E N T A T I O N
Démolition : 2026
Permis de démolir n° PD 88 304 25 M0001
▻ Délivré le 30/06/2025
A R C H I T E C T U R E
Superficie du terrain : 10 905 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Vosges (88)
Ville : Mirecourt (88500)
Adresse : 241, rue Docteur-Grosjean
Fonction : Industrie
Démolition du centre d’intervention de Nancy-Joffre.
P R É S E N T A T I O N
Construction : 1991
Démolition : 2025 → 2026
Fonction : Caserne de pompiers
Permis de démolir : PD 54 395 24 00018
--▻ Délivré le 26/08/2024
A R C H I T E C T U R E
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Travaux de développement du réseaux de chauffage urbain de Mirecourt.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Vosges (88)
Ville : Mirecourt (88500)
Déconstruction du cercle de la base de Nancy dans le cadre du projet Grand Nancy Thermal.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Armée / Restaurant
Déconstruction : 2019 → 2020
Permis de Démolir n° 54 395 19 R0002 délivré le 22 mai 2019
Niveaux : R+3
Hauteur : ≈15 m
Surface de plancher à démolir : 3 800 m²
Superficie du terrain : 11 336 m²
Construction de l'ensemble immobilier Les Rivages composé de 4 bâtiments pour 98 logements en accession à la propriété et d’une résidence services seniors de 115 logements.
Le projet se situe sur l'ancien site des Entreprises Jules Kronberg (négociant en charbon). Quelques éléments seront conservés comme la cheminée d'une hauteur de 38 mètres ainsi qu’un bâtiment situé sur le bord du boulevard Lobau.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 45, boulevard Lobau
Fonction : Logements
Construction : 2021 → 2022
► Architecte : Malot & Associés
► PC n° 54 395 19 R0067 délivré le 11/10/2019
Niveaux : R+6
Hauteur : 25.00 m
Surface de plancher : 12 989 m²
Superficie du terrain : 5 610 m²
Travaux de reprise des affouillements à l'aval du barrage de Jouy-aux-Arches sur la Moselle.
P R É S E N T A T I O N
Durée des travaux : août 2025 → mai 2026
Montant des travaux : 797 511,72 €
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Moselle (57)
Ville : Jouy-aux-Arches (57130)
Adresse : barrage de Jouy-aux-Arches
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
Construction d'un site de maintenance et de remisage dédié à la ligne Nancy - Mirecourt - Vittel - Contrexéville à Mirecourt.
P R É S E N T A T I O N
Construction : 2025 → 2027
Architecte : JFS architectes
Fonction : Transport
Permis de construire : PC 88 304 24 M0012
▻ Délivré le 02/05/2025
A R C H I T E C T U R E
Hauteur : 12,25 m
Surface de plancher : 2 146 m²
Superficie du terrain : 25 253 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Vosges (88)
Ville : Mirecourt (88500)
Adresse : 108, avenue Chavanne
www.thetravelpictures.com: An excavator bucket standing by at a demolition site in the middle of the town of Oulu in the Northern Finland. - ift.tt/2JcknJJ //
Démolition du centre d’intervention de Nancy-Joffre.
P R É S E N T A T I O N
Construction : 1991
Démolition : 2025 → 2026
Fonction : Caserne de pompiers
Permis de démolir : PD 54 395 24 00018
--▻ Délivré le 26/08/2024
A R C H I T E C T U R E
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Hasselblad 500 C/M
Carl Zeiss Distagon 50mm 1:4 C T*
Ilford HP5 Plus 400
Self-developed in Kodak HC-110 1+31 (B) @ 20°C for 5 minutes. Agitated constantly the first minute, then 3 times every minute.
Scanned w/ Epson V800.
Travaux de développement et d'interconnexion des réseaux de chauffage urbain de la Métropole du Grand Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Vandoeuvre-lès-Nancy (54500)
Remplacement de 7 aiguillages ainsi que 1 km de voie en gare d’Onville.
P R É S E N T A T I O N
Durée des travaux : 03 mars 2026 → 26 avril 2026
Montant des travaux : 7 000 000 €
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Onville (54890)
Déconstruction du cercle de la base de Nancy dans le cadre du projet Grand Nancy Thermal.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Armée / Restaurant
Construction : 1974 → 1975
• Architecte : Gruel
Déconstruction : 2019 → 2020
Permis de Démolir n° 54 395 19 R0002 délivré le 22 mai 2019
Niveaux : R+3
Hauteur : ≈15 m
Surface de plancher à démolir : 3 800 m²
Superficie du terrain : 11 336 m²
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
Portes ouvertes à la Carrière de Trapp de Raon-l'Étape lors des Journées européennes du patrimoine 2023.
Poids en ordre de marche : 104 500 kg
Capacité du godet : 10 - 14 m³
“III-6 -- WHEN MAN GOES TO MARS -- This could be the way, according to an artist’s concept showing what a 1990s mission armada might entail. Overhead are several solar-sail powered Interplanetary Shuttles each carrying up to 25 tons. They have landed two manned capsules, various rovers and processors to mine and study the Martian surface where most promising. Before astronauts would arrive, a nuclear power station also would be landed. Continuing research and development might make such a 3-year mission by a 4-man crew possible within two decades, a JPL scientific study group says.”
And/or:
“Artist's impression of a mission to Mars in the 1990s. Visible in the image are two manned capsules each with a satellite receiving antenna for transmitting and receiving information. Various rovers and processors would collect samples of Martian soil and rocks for laboratory analysis. Overhead are several Interplanetary Shuttles powered by solar-sails, which transport people and goods between the planets. The mission would last for three years and involve four astronauts. The project would also involve the building of a nuclear power plant on the planet.”
Yet another beautiful work by Ken Hodges. R.I.P. Brother & Thank You:
www.legacy.com/us/obituaries/latimes/name/ken-hodges-obit...
Credit: Legacy website
Poids en ordre de marche : 24 800 - 29 100 kg
Travaux d'aménagement d'une base de loisirs "la plage des Deux Rives" à Nancy et à Tomblaine.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000) / Tomblaine (54510)
Quartier : Nancy Est
Restructuration de l'ancien Hôpital Villemin en une résidence intergénérationnelle de 82 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue de Nabécor
Fonction : Logements
Construction : 2025 → 2026
▻ Architecte : GHA ARCHITECTES
Permis de construire n° PC 54 395 24 00041
▻ Délivré le 24/07/2024
Niveaux : R+4
Hauteur : ≈16,00 m
Surface de plancher existante : 4 821,50 m²
Surface de plancher créée : 849 m²
Portes ouvertes à la Carrière de Trapp de Raon-l'Étape lors des Journées européennes du patrimoine 2023.
Poids en ordre de marche : 104 500 kg
Capacité du godet : 10 - 14 m³
Déconstruction du cercle de la base de Nancy dans le cadre du projet Grand Nancy Thermal.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Armée / Restaurant
Déconstruction : 2019 → 2020
Permis de Démolir n° 54 395 19 R0002 délivré le 22 mai 2019
Niveaux : R+3
Hauteur : ≈15 m
Surface de plancher à démolir : 3 800 m²
Superficie du terrain : 11 336 m²
Portes ouvertes à la Carrière de Trapp de Raon-l'Étape lors des Journées européennes du patrimoine 2023.
Poids en ordre de marche : 104 500 kg
Capacité du godet : 10 - 14 m³
Poids en ordre de marche : 36 950 - 37 330 kg
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
Poids en ordre de marche : 46 500 - 48 900kg
Travaux de création d'une zone verte entre le projet de la Cité du Soleil et l'autoroute A3 à Bettembourg.
Pays : Luxembourg 🇱🇺
Ville : Bettembourg (L-3452)
Adresse : route de Mondorf
Construction : 2024 → 2025
Travaux de terrassement pour l'extension d'un centre de recyclage à Bettembourg.
Pays : Luxembourg 🇱🇺
Ville : Bettembourg (L-3452)
Adresse : Z.A.E. Wolser Bs
Fonction : Industrie
Construction : 2025 → 2027
Démolition d'une ancienne marbrerie dans le quartier Nancy Est en vue de la construction d'un immeuble de bureaux. Le nouvel ensemble de 1 614 m² est dessiné par le cabinet Rabolini-Schlegel et Associés. Livraison prévue en 2020.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Est
Adresse : 58, boulevard d'Austrasie
Fonction : Commerce
Construction : ≈1930
Déconstruction : 2018
• Entreprise : Melchiorre Démolition
Niveaux : R+1
Hauteur : ≈10.00 m
Superficie du terrain : 2 590 m²
“UNMANNED MARS VISIT ARTWORK —- Art concept
depicting unmanned exploration of Mars, considered
as a possible precursor to a manned exploration of Mars in the next century. A study at the Jet Propulsion Laboratory lead to a series of art concepts depicting scenarios considered.
pg. 41-3”
Above is per the caption associated with the black & white version of the photo.
Possibly an evolution of JPL’s original “Purple Pigeon” concept/proposal, depicting a Mars Surface Sample Return (MSSR) mission.
In lieu of any other imagery, I refer to this as a possible extension of the Mars Purple Pigeon proposal simply because Mr. Portree alludes to such in referencing an image with similar rovers:
spaceflighthistory.blogspot.com/2018/12/dual-mars-rovers-...
Credit: “No Shortage of Dreams: Mars Multi-Rover Mission (1977)”/David S. F. Portree
One of so many wonderful works for JPL by Ken Hodges.
However, for whatever it's worth, the official caption of a companion?/associated? photo (JPL photo no. P-17055AC) makes absolutely no mention of a sample return intent/capability.
Frankly, the multiple JPL 1970s proposals for Mars exploration during the 1980s & beyond, are rather confusing & convoluted. At least to me.
Travaux de terrassement dans le cadre du projet Les Rives du Parc à Talange sur le site d'une ancienne friche industrielle.
Pays : France 🇫🇷
Région : Grand Est (Alsace)
Département : Moselle (57)
Ville : Talange (57525)
Adresse : rue de Metz
Construction d'un site de maintenance et de remisage dédié à la ligne Nancy - Mirecourt - Vittel - Contrexéville à Mirecourt.
P R É S E N T A T I O N
Construction : 2025 → 2027
Architecte : JFS architectes
Fonction : Transport
Permis de construire : PC 88 304 24 M0012
▻ Délivré le 02/05/2025
A R C H I T E C T U R E
Hauteur : 12,25 m
Surface de plancher : 2 146 m²
Superficie du terrain : 25 253 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Vosges (88)
Ville : Mirecourt (88500)
Adresse : 108, avenue Chavanne
Chantier de modernisation de l'échangeur de Pontpierre sur l'autoroute A4 dans le cadre du projet GRIDX.
Poids en ordre de marche : 36 950 - 37 330 kg
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²
Déconstruction du cercle de la base de Nancy dans le cadre du projet Grand Nancy Thermal.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Armée / Restaurant
Déconstruction : 2019 → 2020
Permis de Démolir n° 54 395 19 R0002 délivré le 22 mai 2019
Niveaux : R+3
Hauteur : ≈15 m
Surface de plancher à démolir : 3 800 m²
Superficie du terrain : 11 336 m²
Poids en ordre de marche : 36 950 - 37 330 kg
Démolition du centre d’intervention de Nancy-Joffre.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 22, boulevard Joffre
Fonction : Autre
Construction : 1991
Démolition : 2025
Permis de démolir n° PD 54 395 24 00018
▻ Délivré le 26/08/2024
Niveaux : R+5
Hauteur : 32,00 m
Surface de plancher : 6 889 m²
Superficie du terrain : 2 289 m²