View allAll Photos Tagged DesignBuild

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

Our client now fully moved into the house we built for her.

This 145 room, 140,000 s.f. limited stay hotel is conveniently located in a new industrial park next to the McClellan-Palomar airport. Homewood Suites is a member of the Hilton family of hotels.

 

Gray-I.C.E. Builders is Ranked 6th Among the Top Builders of Interior Retail Space and 6th in the Top 20 Commercial Projects.

 

For More information visit www.gray.com/hotel-facility-construction - all images (c) Gray Construction

The 143,057 s.f. pre-engineered warehouse includes 3,500 s.f. of cold storage space, as well as an office, tire center, and an equipment mezzanine. This project was completed in just 110 calendar days.

All images (c) Gray Construction - Visit Gray at www.gray.com

The 143,057 s.f. pre-engineered warehouse includes 3,500 s.f. of cold storage space, as well as an office, tire center, and an equipment mezzanine. This project was completed in just 110 calendar days.

All images (c) Gray Construction - Visit Gray at www.gray.com

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

 

Check out this classic style design build transitional kitchen remodel with custom Aplus white cabinets in city of Irvine Orange County www.aplushomeimprovements.com/portfolio_page/irvine_trans... #kitchens #kitchendesign #kitchenideas #kitchenremodel #dreamkitchen #kitcheninspiration #kitchenrenovation #interior #interiordesign #interiordesigner #kitchentrends #KitchenCabinetsOrangeCounty #cabinets #orangecounty #design #homedecor #construction #customremodel #hgtv #houzz #california #contractor #kitchencabinets #homedesign

Ezra Wheeler Design Build- Condominium A&B

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

1 2 ••• 5 6 8 10 11 ••• 79 80