Site plan "B" for the Toyota dealership at 4900 Weidemar Lane in Austin, TX
(COA Case #SP-2009-0323C) Circa 2009
Construction d'un parc de stationnement de 377 places et restructuration du pont des Fusillés dans la ZAC Nancy Grand Coeur.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : boulevard Joffre
Fonction : Parking
Construction : 2016 → 2019
• Architecte : Cabinet Beal et Blanckaert
• Gros œuvre : Eiffage Construction Lorraine
Permis d'aménager n° 54 395 15 00001 délivré le 21 décembre 2015
Superficie du terrain : 6 092 m²
Superficie de l'ouvrage à démolir : 1 666 m²
Construction d'un bâtiment de bureaux.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresses : boulevard de la Mothe / rue des Cinq-Piquets
Fonction : Bureaux
Construction : 2024 → 2026
▻ Architecte : PPX Architectes
Permis de construire n° PC 54 395 23 00034
▻ Délivré le 11/10/2023
Niveaux : R+5
Hauteur : 22,00 m
Surface de plancher : 5 296,60 m²
Superficie du terrain : 1 834 m²
Normally we get the high level shots of the Naples canopy using the drone, but fortunately the previous University that visited had completed the Gherkin so we were able to negotiate our way up to the top and take a birds eye view.
This is the shot while the props are still in and the team are checking all the bolts are in and fully tightened.
Striping & Signage plan for the roadway improvements (Walmart at 620 & 2222 in Austin, TX - 4 points). (COA Case #SPC-04-0048C) Circa 2005
Courtyard storm drainage plan for Lakeshore Apartments located at 2220 Elmont Dr., Austin, TX. (COA Case #SP-2011-0114C). Plans were approved in 2011; Construction began late 2011/early 2012.
Construction de l'ensemble immobilier Les Rivages composé de 4 bâtiments pour 98 logements en accession à la propriété et d’une résidence services seniors de 115 logements.
Le projet se situe sur l'ancien site des Entreprises Jules Kronberg (négociant en charbon). Quelques éléments seront conservés comme la cheminée d'une hauteur de 38 mètres ainsi qu’un bâtiment situé sur le bord du boulevard Lobau.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 45, boulevard Lobau
Fonction : Logements
Construction : 2021 → 2022
► Architecte : Malot & Associés
► PC n° 54 395 19 R0067 délivré le 11/10/2019
Niveaux : R+6
Hauteur : 25.00 m
Surface de plancher : 12 989 m²
Superficie du terrain : 5 610 m²
Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Malzéville (54220) / Saint-Max (54130)
Durée des travaux : 2020 → 2021
Inauguration : 18/12/2021
Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.
Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.
Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.
Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.
Construction d'un parc de stationnement de 377 places et restructuration du pont des Fusillés dans la ZAC Nancy Grand Coeur.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : boulevard Joffre
Fonction : Parking
Construction : 2016 → 2019
• Architecte : Cabinet Beal et Blanckaert
• Gros œuvre : Eiffage Construction Lorraine
Permis d'aménager n° 54 395 15 00001 délivré le 21 décembre 2015
Superficie du terrain : 6 092 m²