Nostromo-Corridor-17
I did some casting to build a couple of corridor walls for deck A of the Nostromo. These two corridor walls are full resin casts and are about 90% complete in build - need to add a control panel or two as well as a few additional tubes/wire. Everything you see in these images are cast pieces from molds that came from scratch builds (for exception of the Parker and Brett figures). I'm very close to completing all corridors leading from the galley of the ship. All I need to do it create the flooring....which means some laser work is about to go out soon. #alien #nostromo #sith_fire30
Nostromo-Corridor-17
I did some casting to build a couple of corridor walls for deck A of the Nostromo. These two corridor walls are full resin casts and are about 90% complete in build - need to add a control panel or two as well as a few additional tubes/wire. Everything you see in these images are cast pieces from molds that came from scratch builds (for exception of the Parker and Brett figures). I'm very close to completing all corridors leading from the galley of the ship. All I need to do it create the flooring....which means some laser work is about to go out soon. #alien #nostromo #sith_fire30