Randy Moss
rmoss
Hardware integration testing
System integration test: production power supply, LED controller, lights, and platform. Note that platform is upside down.
189
views
0
faves
0
comments
Uploaded on September 16, 2008
Taken on September 11, 2008
Hardware integration testing
System integration test: production power supply, LED controller, lights, and platform. Note that platform is upside down.
189
views
0
faves
0
comments
Uploaded on September 16, 2008
Taken on September 11, 2008