Adam Preble
Adam Preble
Layout Construction - June 15 2013
1/4" Plywood is screwed down on the 1x4 joists, with 2" foam resting on top. The track is in disarray after shuffling the foam around.
182
views
0
faves
0
comments
Uploaded on June 16, 2013
Taken on June 15, 2013
Layout Construction - June 15 2013
1/4" Plywood is screwed down on the 1x4 joists, with 2" foam resting on top. The track is in disarray after shuffling the foam around.
182
views
0
faves
0
comments
Uploaded on June 16, 2013
Taken on June 15, 2013