Back to photostream

Oxford and Cambridge Boat Race Since 1829

The Worlds Longest Surviving Sporting Challenge. Fulham.

Putney Bridge is a Grade II listed bridge over the River Thames in west London, linking Putney on the south side with Fulham to the north. The bridge has medieval parish churches beside its abutments: St Mary's Church, Putney is built on the south and All Saints Church, Fulham on the north bank.

 

The first bridge of any kind between the two parishes of Fulham and Putney was built during the Civil War: after the Battle of Brentford in 1642, the Parliamentary forces built a bridge of boats between Fulham and Putney.

 

In 1886 construction of the stone bridge that stands today, on a new alignment, was completed. A new road – Putney Bridge Approach – was laid to connect the northern end of the new bridge with Fulham High Street at its junction with New King's Road; in consequence the southernmost stretch of Fulham High Street was reduced to a cul-de-sac. The bridge was designed by civil engineer Sir Joseph Bazalgette as a five-span structure, built of stone and Cornish granite. Bazalgette also designed London's sewerage system, and the bridge integrates two of his five outfall sewers running perpendicular to it.

 

The bridge has been the starting point for The Boat Race since 1845 when the course was revised.

123 views
0 faves
0 comments
Uploaded on September 2, 2022
Taken on August 31, 2022