Back to photostream

Wonderful Worms-12

A full renovation of St Peter's Cathedral only began in 1886. Because of structural weaknesses and damage suffered in the fire of 1689, the west choir had to be completely rebuilt. Great importance was placed on reusing as much of the original stone as possible. In the outer wall this was taken so far that today all but a small portion of the old stones are in their original locations. On the inside wall, large flat stones had to be used and faithfully reconstructed. The sharply bent dosseret over the central rosette window was not rebuilt since it was blamed for the structural issues. Today the dosserets run perpendicular to the edge of the rosette and frame it clearly. The general renovations, which also included renovation of the chapel of St Nicholas, the reconstruction of the whole floor and the addition of an entirely new crypt for the tombs of the Salians under the high choir, were only completed in 1935.

 

In the course of the renovation work, in 1920 the head architect, Philipp Brand, was standing on the scaffolding when a dachshund attacked, and attempted to bite him on the leg. He stepped to the side and as a result escaped from a falling stone which had broken loose above him, killing the dog. In the upper left of the south portal, at the edge of the window in the left corner is a statue of the dachshund – Philipp Brand had this installed as a small memorial.

In the allied bombing on 21 February and 18 March 1945, the cathedral was damaged by a bomb, which did not affect the interior. The roof burnt but the vaults remained intact.

4,536 views
96 faves
0 comments
Uploaded on June 17, 2019
Taken on May 6, 2019