Back to photostream

Theme and variation

In heavy rain at the GCR Autumn Gala the 2-6-0 2MT tender locomotives run into the headshunt at Swithland Sidings

It is possible to see the subtle differences in these engines, with clackvalves, injectors, lubricators, cab roof and so on. Can't see how it was worth the drawing office time, as only the cab profile change was of any benefit

2,533 views
35 faves
3 comments
Uploaded on December 3, 2018
Taken on October 6, 2018