Helical Pier Installed & Concrete Pier Clipped
This Helical pier will, together with the other 15 Helical piers installed, counteract vertical movement and stabilize this foundation. Piers are set on stable soil or bedrock whether that is 25 ft or more below the foundation, as in this particular case, and, the house is set on the piers.
It was necessary to clip the existing concrete piers away from the bottom of the foundation a minimum of 24 inches. The concrete pier has failed and it is necessary that it does not interfere with the lift and leveling process.
Check this out for more information on Helicial Piers: www.denverfoundationrepair.com/about-us/post-1064-what-pe...
Helical Pier Installed & Concrete Pier Clipped
This Helical pier will, together with the other 15 Helical piers installed, counteract vertical movement and stabilize this foundation. Piers are set on stable soil or bedrock whether that is 25 ft or more below the foundation, as in this particular case, and, the house is set on the piers.
It was necessary to clip the existing concrete piers away from the bottom of the foundation a minimum of 24 inches. The concrete pier has failed and it is necessary that it does not interfere with the lift and leveling process.
Check this out for more information on Helicial Piers: www.denverfoundationrepair.com/about-us/post-1064-what-pe...