Back to photostream

Afternoon Loads

The Deseret Power Railway rolls west near milepost 23 with another unit coal train for the Bonanza Power Plant. This is the 2nd trick run which generally, when there is a train, finishes loading between 3 and 4 pm, and arrives at the power plant around 5 pm.

 

The DPR runs roughly 35 rail miles between Blue Mountain Energy's Deserado Mine loadout near Dinosaur, CO and the Bonanza Power Plant near Bonanza, UT.

1,813 views
45 faves
4 comments
Uploaded on July 17, 2020
Taken in July 2020