Panjang Hybrid Power System Indonesia
Panjang, Indonesia, Hybrid Power System. This system was installed in June 2012 by OPS. The system compromises 2 x OPS HPC-75kVA power conditioning units which operate in parallel and combine the existing generator sets, solar PV array and battery bank onsite.
The above photo depicts staff training of the OPS SCADA local and remote monitoring and control software.
Panjang Project info at the OPS Blog here
Visit the Optimal Power Indonesia website here