Back to photostream

Three modern distributed wind turbines are being installed at the National Renewable Energy Laboratory’s (NREL’s) Distributed Integrated Energy Laboratory (DIEL) at Flatirons Campus. The project will serve as the baseline for new reference turbines and fo

October 2, 2023 - Three modern distributed wind turbines are being installed at the National Renewable Energy Laboratory’s (NREL’s) Distributed Integrated Energy Laboratory (DIEL) at Flatirons Campus. The project will serve as the baseline for new reference turbines and for model validation.

 

Jared Rivers (top) and Michael Davis Jr. from Hoss Consulting climb the Bergey Xcel 15 turbine tower to complete final installation.

 

(Photo by Bryan Bechtold / NREL)

115 views
0 faves
0 comments
Uploaded on December 26, 2023
Taken on October 2, 2023