LHC : CMS waiting for tracker insertion
More explanations at the top of the set
Last few hours of emptiness inside. The two barrel wheels have been moved onto the fully cabled Z- side of the vacuum tank containing the magnet. The tracker insertion platform sits on top of the HF raising structure. The tracker is now inside. A picture taken during insertion.