Metrolinx
Metrolinx
8. Before and after sodablasting of interior wall of the east pedestrian tunnel.
8. Avant et après le nettoyage à la soude du mur intérieur du tunnel piétonnier de l’est.
1,858
views
0
faves
0
comments
Uploaded on March 13, 2015
Taken on December 15, 2014
8. Before and after sodablasting of interior wall of the east pedestrian tunnel.
8. Avant et après le nettoyage à la soude du mur intérieur du tunnel piétonnier de l’est.
1,858
views
0
faves
0
comments
Uploaded on March 13, 2015
Taken on December 15, 2014