Back to photostream

Entering Blissfield

Running long hood forward, the way EMD set it up for CV when they bought it new in 1957, Adrian & Blissfield's job out of Adrian is arriving in Blissfield. The train is strung out through the second of two significant bridges over the River Raisin. They have 5 covered hoppers on the drawbar and ADBF 1759 is bringing up the rear. They'll ultimately leave 1752 in Blissfield and return to Adrian with just the 1759 and two tank cars. Blissfield, MI 11/25/2022

1,567 views
48 faves
7 comments
Uploaded on November 27, 2022
Taken on November 25, 2022