Back to photostream

wind tunnel controller v2

The old PLC developed a fault, so power drive systems shipped me a new one in 24hours! I installed it with a mornings work and now things are working better than ever. The only problem is that the new PLC is too big for the case so I had to bolt it on the outside!

2,241 views
0 faves
0 comments
Uploaded on June 17, 2011
Taken on June 17, 2011