Test Run
Metra MPI MP36PH-3S 402 was out and about on a joy ride shortly after delivery. It was passing the Stone Avenue stop on the BNSF Chicago Subdivision in 2003.
BNSF wasn't impressed with these things and Metra eventually reassigned them to other lines.
1,977
views
36
faves
2
comments
Uploaded on July 8, 2022
Taken in February 2003
Test Run
Metra MPI MP36PH-3S 402 was out and about on a joy ride shortly after delivery. It was passing the Stone Avenue stop on the BNSF Chicago Subdivision in 2003.
BNSF wasn't impressed with these things and Metra eventually reassigned them to other lines.
1,977
views
36
faves
2
comments
Uploaded on July 8, 2022
Taken in February 2003