Avignon - 030 (2021)
As described previously, Avignon has the newest tramway system in all of France (at 2021 August). This extends 5.2 km (3.2 mi) between Saint-Roch, Gare Centre and Saint-Chamand, and was opened on 2019 October 19.
According to current (2021 August) plans, Saint-Roch terminal (shown here) will be served by Line T2 from 2025, and Line T1 will be routed to a new terminal, at Horloge - Hôtel de Ville within the city walls.
2021 August 13.
Avignon - 030 (2021)
As described previously, Avignon has the newest tramway system in all of France (at 2021 August). This extends 5.2 km (3.2 mi) between Saint-Roch, Gare Centre and Saint-Chamand, and was opened on 2019 October 19.
According to current (2021 August) plans, Saint-Roch terminal (shown here) will be served by Line T2 from 2025, and Line T1 will be routed to a new terminal, at Horloge - Hôtel de Ville within the city walls.
2021 August 13.