Back to album

Elite V8 project 275

The completed bell housing. We started with the original Ropver manual bellhousing, from which 45mm was removed from the gearbox sidee. The 15mm piece of plate alluminium plate was cut to fit and welded. Finally, it was skimmed to ensure that both sides were exactly parallel. (161)

597 views
0 faves
0 comments
Uploaded on October 20, 2006
Taken on September 15, 2006