Back to album

Front Wall complete

All the metal studs are in place within the Top & bottom metal channel.

 

Total elapsed time: Floor channel to this first wall took about 1.5 hours.

54 views
0 faves
0 comments
Uploaded on May 6, 2007
Taken on March 31, 2007