Back to photostream

Artemis I Orion at Operations and Checkout Building

The Orion Artemis I spacecraft arrived at NASA's Kennedy Space Center on March 25, 2020 after going through rigorous environmental training at NASA's Plum Brook Station. At the Kennedy Operations and Checkout building, the spacecraft was rotated to a vertical position and then lifted into the Final Assembly and System Test (FAST) cell workstation on March 30. Yellow protection panels that were temporarily installed on the crew module adapter during the environmental testing are in the process of being removed. The spacecraft is now being prepared for post-shipping checkout testing.

24,786 views
5 faves
0 comments
Uploaded on April 9, 2020
Taken on March 30, 2020