Back to album

future hole 19 (par 1)

the ball return "hole".

the plan here is to build a scaffold with aluminum wire (left behind from a hydro tower) to support a system of troughs & tubes to carry the ball over "the dump" into the angled tree, where it'll then turn to the left & downward to deposit the ball back at the first "tee"

340 views
0 faves
0 comments
Uploaded on September 18, 2023
Taken on September 17, 2023