Construction: Six Nights Later
At two days to go we had most of the structural elements up: the junkyard, the drain at the end, the stuff lining the sides, and both lighting rigs assembled.
231
views
0
faves
0
comments
Uploaded on November 20, 2012
Taken on October 29, 2012
Construction: Six Nights Later
At two days to go we had most of the structural elements up: the junkyard, the drain at the end, the stuff lining the sides, and both lighting rigs assembled.
231
views
0
faves
0
comments
Uploaded on November 20, 2012
Taken on October 29, 2012