Back to album

Construction: Six Nights Later

At two days to go we had most of the structural elements up: the junkyard, the drain at the end, the stuff lining the sides, and both lighting rigs assembled.

231 views
0 faves
0 comments
Uploaded on November 20, 2012
Taken on October 29, 2012