Back to album

22JA4448HDRZ-SharpenAI-SoftnessWBeverly M I

The Tug "Beverly M l " was able to push right into the Keefer Terminal with a load of 4 Turbines. the turbines couldn't be delivered by a Foreign vessel fearing not enough time to clear the Seaway Closing so they loaded them on a barge and one of Mckeils tugs the "Beverly M l " finished the delivery. They came off the "BBC Edge". They unloaded them to the barge at the Heddel Shipyard in Port Weller.

145 views
0 faves
0 comments
Uploaded on January 19, 2022
Taken on January 2, 2022