Back to photostream

143 "ALCHEMY" by Jensen Knives

143: I've removed the drawing and tape from the top of the stack as well as the clamp (it would be in the way now). I have also painted a layer of Dykem on the top surface. I have the bolster stack sitting in the proper position on the frame by lining the stack up with the previous scribed profile marks. I’ve also roughly laid out two 18k Gold stone setting bezels. The construction screws in the end will be hidden under set stones.

 

769 views
0 faves
0 comments
Uploaded on November 10, 2013
Taken on July 11, 2004