jaredigital
Bathroom renovation, finished
Over the course of 5 weeks we tore our bathroom down to the studs and had it completely redone. We moved the shower, turned the old shower into a closet, moved the toilet drain so we could get a bigger shower, moved the old tub drain for the new shower, ran plumbing to the other side of the bathroom for the shower head, modified the plumbing to go from one to two vanity sinks, installed can lights for the shower, and of course put in all new fixtures.
Bathroom renovation, finished
Over the course of 5 weeks we tore our bathroom down to the studs and had it completely redone. We moved the shower, turned the old shower into a closet, moved the toilet drain so we could get a bigger shower, moved the old tub drain for the new shower, ran plumbing to the other side of the bathroom for the shower head, modified the plumbing to go from one to two vanity sinks, installed can lights for the shower, and of course put in all new fixtures.