Idle Layabout
Idle Layabout
Technical rescue
- An advance team abseils down below the simulated accident site to set up a belay station.
- I spent the rest of the day balancing on a 4 inch wide ledge.
- An equalised anchor system is set up to secure a high-line, with which the patient and medic will be lowered down and away from the cliff face.
312
views
0
faves
2
comments
Uploaded on November 10, 2006
Taken on November 5, 2006
Technical rescue
- An advance team abseils down below the simulated accident site to set up a belay station.
- I spent the rest of the day balancing on a 4 inch wide ledge.
- An equalised anchor system is set up to secure a high-line, with which the patient and medic will be lowered down and away from the cliff face.
312
views
0
faves
2
comments
Uploaded on November 10, 2006
Taken on November 5, 2006