Black Canyon Reservoir, northeast of Emmett, Idaho is being re-filled. Muddy banks, once below waterline are treacherous.
Bureau of Reclamation (BOR) began drawing down Black Canyon Reservoir to elevation 2440 feet in October, 2012, for proposed adding a third hydroelectric generating unit and for other maintenance work. At the point of this photograph, reservoir was already being refilled.
218
views
0
faves
2
comments
Uploaded on March 2, 2013
Taken on February 27, 2013
Black Canyon Reservoir, northeast of Emmett, Idaho is being re-filled. Muddy banks, once below waterline are treacherous.
Bureau of Reclamation (BOR) began drawing down Black Canyon Reservoir to elevation 2440 feet in October, 2012, for proposed adding a third hydroelectric generating unit and for other maintenance work. At the point of this photograph, reservoir was already being refilled.
218
views
0
faves
2
comments
Uploaded on March 2, 2013
Taken on February 27, 2013