Florin of Helford (Doug Peterson) Contention 30 Sail No 3270 Y Exeter Canal Basin
Sailboat Specifications
Hull Type: Fin w/spade rudder
Rigging Type: Masthead Sloop
LOA: 29.66 ft / 9.04 m
LWL: 23.88 ft / 7.28 m
Beam: 10.29 ft / 3.14 m
S.A. (reported): 381.00 ft2 / 35.40 m2
Draft (max): 5.66 ft / 1.73 m
Displacement: 5,732 lb / 2,600 kg
Ballast: 3,086 lb / 1,400 kg
S.A./Disp.: 19.09
Bal./Disp.: 53.84
Disp./Len.: 187.91
Construction: GRP
Ballast Type: Lead
First Built: 1977
Last Built: 1980
# Built: 30
Builder: Southern Ocean Ltd (UK)
Designer: Doug Peterson.
Auxiliary Power/Tanks
Engine1 X Diesel 14hp
Fuel capacity: 25.0 Ltr (5.5 G) Total - 1 Tanks
Water capacity: 50.0 Ltr (11.0 G) Total - 1 Tanks
Sailboat Calculations
S.A./Disp.: 19.09
Bal./Disp.: 53.84
Disp./Len.: 187.91
Comfort Ratio: 15.50
Capsize Screening Formula: 2.30
S#: 3.10
Rig and Sail Particulars
I: 37.76 ft / 11.51 m
J: 12.01 ft / 3.66 m
P: 32.51 ft / 9.91 m
E: 9.48 ft / 2.89 m
S.A. Fore: 226.75 ft2 / 21.07 m2
S.A. Main: 154.10 ft2 / 14.32 m2
S.A. Total (100% Fore + Main Triangles) 380.85 ft2 / 35.38 m2
S.A./Disp. (calc.): 19.08
Est. Forestay Len.: 39.62 ft / 12.08 m
Contention 30, Built by Southern Ocean Shipyard, Poole in 1978, Fitted out by Mylor Yachts, Falmouth as a cruiser masthead sloop designed by Doug Peterson. Dark Green GRP Hull with Pale grey decks, Tiller steering Varnished 2010 refit, Rudder has been re-laminated and re-gel coated in the 2009 winter refit. Deck had been painted in 2009 with blakes Multicoat with a non slip finish on top of a non-slip pattern. Cockpit seat and teak slatted floor has been re glued and finished with tropic sealer. 5 Berths in 2 cabins, ... Saloon/Galley, The galley includes 2 medium sized stainless sinks with again pressurised hot and cold taps. Cooker which was replaced in 2008 (Nimbus 2 ring oven and grill electric ignition) cooker area has been faced with metal sheeting.New electric fridge installed in 2008. New Switch panel and GPS alongside with VHF Radio and CD player. Volt Meter and Switching for fridge. 240V Socket also fitted. Yanmar 2QM15 15hp 2 cyl diesel (1980) Re-sprayed 2008, Recondition fitted 2010 Hurth KBW10 Gearbox, Shaft drive with 2 bladed propeller new 2008, Electrics: 3 12volt batteries ( 2 Domestic) and (1 Engine) charged via a Victron battery management charger fitted new in 2008. Also charged from 35A alternator. Florin has been re-wired throughout with new lighting. GPS Cobra colour screen new 2008, Wind direction, Log and Depth new 2008 (Clipper) Mounted above companionway in a pod and set into black perplex, Compass new 2009, VHF by Apelco, Sails and Rigging: Aluminium mast and boom by proctor/Trevor Reed, 6mm stainless steel (5mm baby stay) All replaced in 2009. Running rigging, Spinnaker halyard replaced in 2009 all polyester/wire. Mainsail Sobstad Dacron with two deep slab reefs 1999, Furling Genoa replaced in 2008 Green UV Strip, Profurl furling system again new 2008
Florin of Helford (Doug Peterson) Contention 30 Sail No 3270 Y Exeter Canal Basin
Sailboat Specifications
Hull Type: Fin w/spade rudder
Rigging Type: Masthead Sloop
LOA: 29.66 ft / 9.04 m
LWL: 23.88 ft / 7.28 m
Beam: 10.29 ft / 3.14 m
S.A. (reported): 381.00 ft2 / 35.40 m2
Draft (max): 5.66 ft / 1.73 m
Displacement: 5,732 lb / 2,600 kg
Ballast: 3,086 lb / 1,400 kg
S.A./Disp.: 19.09
Bal./Disp.: 53.84
Disp./Len.: 187.91
Construction: GRP
Ballast Type: Lead
First Built: 1977
Last Built: 1980
# Built: 30
Builder: Southern Ocean Ltd (UK)
Designer: Doug Peterson.
Auxiliary Power/Tanks
Engine1 X Diesel 14hp
Fuel capacity: 25.0 Ltr (5.5 G) Total - 1 Tanks
Water capacity: 50.0 Ltr (11.0 G) Total - 1 Tanks
Sailboat Calculations
S.A./Disp.: 19.09
Bal./Disp.: 53.84
Disp./Len.: 187.91
Comfort Ratio: 15.50
Capsize Screening Formula: 2.30
S#: 3.10
Rig and Sail Particulars
I: 37.76 ft / 11.51 m
J: 12.01 ft / 3.66 m
P: 32.51 ft / 9.91 m
E: 9.48 ft / 2.89 m
S.A. Fore: 226.75 ft2 / 21.07 m2
S.A. Main: 154.10 ft2 / 14.32 m2
S.A. Total (100% Fore + Main Triangles) 380.85 ft2 / 35.38 m2
S.A./Disp. (calc.): 19.08
Est. Forestay Len.: 39.62 ft / 12.08 m
Contention 30, Built by Southern Ocean Shipyard, Poole in 1978, Fitted out by Mylor Yachts, Falmouth as a cruiser masthead sloop designed by Doug Peterson. Dark Green GRP Hull with Pale grey decks, Tiller steering Varnished 2010 refit, Rudder has been re-laminated and re-gel coated in the 2009 winter refit. Deck had been painted in 2009 with blakes Multicoat with a non slip finish on top of a non-slip pattern. Cockpit seat and teak slatted floor has been re glued and finished with tropic sealer. 5 Berths in 2 cabins, ... Saloon/Galley, The galley includes 2 medium sized stainless sinks with again pressurised hot and cold taps. Cooker which was replaced in 2008 (Nimbus 2 ring oven and grill electric ignition) cooker area has been faced with metal sheeting.New electric fridge installed in 2008. New Switch panel and GPS alongside with VHF Radio and CD player. Volt Meter and Switching for fridge. 240V Socket also fitted. Yanmar 2QM15 15hp 2 cyl diesel (1980) Re-sprayed 2008, Recondition fitted 2010 Hurth KBW10 Gearbox, Shaft drive with 2 bladed propeller new 2008, Electrics: 3 12volt batteries ( 2 Domestic) and (1 Engine) charged via a Victron battery management charger fitted new in 2008. Also charged from 35A alternator. Florin has been re-wired throughout with new lighting. GPS Cobra colour screen new 2008, Wind direction, Log and Depth new 2008 (Clipper) Mounted above companionway in a pod and set into black perplex, Compass new 2009, VHF by Apelco, Sails and Rigging: Aluminium mast and boom by proctor/Trevor Reed, 6mm stainless steel (5mm baby stay) All replaced in 2009. Running rigging, Spinnaker halyard replaced in 2009 all polyester/wire. Mainsail Sobstad Dacron with two deep slab reefs 1999, Furling Genoa replaced in 2008 Green UV Strip, Profurl furling system again new 2008